Haier HC30D2VAR User Manual - Page 10
Refrigerant, Metering Devices, Table 4
View all Haier HC30D2VAR manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 10 highlights
1.Tubing should be cut square. Make sure it is round and free of burrs at the connecting ends. Clean the tubing to prevent contamination from entering the system. 2.Make sure that both refrigerant stop valves at the outdoor unit are closed. 3.Push the tubing into the fitting until it stops. This prevents flux from getting into the system. 4.Remove the cap and Schrader valve core from the service port to protect the valve seals. 5.Wrap a wet rag around the valve stub before brazing. 6.Braze the joints of interconnecting tubing. Flow dry nitrogen into the shutoff valve port and through the tubing while brazing. 7.After brazing quench with a wet rag to cool the joint. Reinstall the Schrader core in the valve, if removed for brazing. 8.Pressurize the lines to 150 psi maximum with dry nitrogen. Check for leaks at all joints with liquid detergent. If a leak is found, repair it after removing the nitrogen. Repeat the process and re-ckeck. 9.Do not purge the lines with refrigerant. Evacuate the lines and indoor coil. Refrigerant Metering Devices Replace the existing indoor unit fixed orifice with the orifice supplied with the outdoor unit. See table 4 for the fixed orifice size for each unit. Table 4 Fixed orifice size outdoor model indoor model orifice size HC18D2VAR HB2400VD1M20 057 HC24D2VAR HB2400VD1M20 062 HC30D2VAR HB3600VD1M22 071 HC36D2VAR HB3600VD1M22 078 HC42D2VAR HB4800VD1M22 083 8