Page 17 highlights

If an AQL-CHEM kit will be used, take into consideration the space necessary for mounting the unit as well as running the plumbing lines from the AQL-CHEM's probe cell to the pool plumbing. Refer to the AQL-CHEM manual for specific mounting instructions. Plumbing Ensure that the Aqua Rite Pro installation does not constitute a cross connection with the local potable water supply. Consult local plumbing codes. The Aqua Rite Pro is packaged with a flow switch and cell unions. The cell must be purchased separately. Refer to page 1 for information about available chlorinator cells. The flow switch and cell should be plumbed in the return line to the pool/spa. The preferred installation is after (downstream) all the pool equipment (filter, heater, solar, etc.). The electrolytic cell and flow switch tee fitting are designed to be plumbed into 2" (51mm) PVC pipe. Adapters (not included) can be used for systems with 1½" (38 mm) plumbing. For proper plumbing, refer to the overview diagram on page 13. Alternate configurations #1 shows the flow switch can also be in front of the cell. Configurations #2 and #3 allow for chlorination of both the pool and spa during spa spillover operation, but prevent overchlorination of the spa during "spa only" operation. Never use configuration #4. 1 2 12" min 12" min 3 4 Flow Switch: IMPORTANT: There must be at least a 12" (25cm) straight pipe run before (upstream) the flow switch. If the switch is plumbed after the cell, the cell can by counted as the 12" (25cm) of straight pipe. To ensure proper operation, verify that the arrow on the flow switch (located on top of gray hex) points in the direction of water flow. 14

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24

14
2
3
4
12”
1
12”
min
min
If an AQL-CHEM kit will be used, take into consideration the space necessary for
mounting the unit as well as running the plumbing lines from the AQL-CHEM's probe
cell to the pool plumbing.
Refer to the AQL-CHEM manual for specific mounting in-
structions.
Plumbing
Ensure that the Aqua Rite Pro installation does not constitute a cross connection with
the local potable water supply. Consult local plumbing codes.
The Aqua Rite Pro is packaged with a flow switch and cell unions.
The cell must be
purchased separately.
Refer to page 1 for information about available chlorinator cells.
The flow switch and cell should be plumbed in the return line to the pool/spa.
The
preferred installation is
after (downstream) all the pool equipment (filter, heater, solar,
etc.).
The electrolytic cell and flow switch tee fitting are designed to be plumbed into 2"
(51mm) PVC pipe.
Adapters (not included) can be used for systems with 1½" (38 mm)
plumbing.
For proper plumbing, refer to the overview diagram on page 13.
Alternate configura-
tions #1 shows the flow switch can also be in front of the cell.
Configurations #2 and #3
allow for chlorination of both the pool and spa during spa spillover operation, but
prevent overchlorination of the spa during "spa only" operation.
Never use configura-
tion #4.
Flow Switch:
IMPORTANT: There must be at least a
12" (25cm)
straight pipe run
before (upstream) the flow switch.
If the switch is plumbed after the
cell, the cell can by counted as the 12" (25cm) of straight pipe.
To
ensure proper operation, verify that the arrow on the flow switch
(located on top of gray hex) points in the direction of water flow.