Hayward Aqua Rite AQR - Page 13
Installation - 120
View all Hayward Aqua Rite manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 13 highlights
INSTALLATION Installation must be performed in accordance with Local and NEC codes. 120/240 VAC POWER G LDLINE CONTROLS INC. FROM FROM POOL SPA TO TO SPA POOL Preparing Pool/Spa Water Refer to page 1 for recommended chemical levels. The pool's chemistry must be balanced BEFORE activating the Aqua Rite®. NOTE: If the pool does not have new water, add 1 quart (1 liter) of metal remover and 1 quart (1 liter) of non-copper based algaecide to the pool, per manufacturer's instructions. This ensures a quick, troublefree transfer to the Aqua Rite system. Mounting the Aqua Rite Control The Aqua Rite is contained in a raintight enclosure that is suitable for outdoor mounting. The control must be mounted a minimum of 5 ft. (2 meters) horizontal distance (or more, if local codes require) from the pool/spa. The control is designed to mount vertically on a flat surface with the knockouts facing downward. Because the enclosure also acts as a heat sink (disperses heat from inside the box), it is important not to block the four sides of the control. Do not mount Aqua Rite inside a panel or tight enclosed area. 10