HP 22.1kVA HP intelligent power infrastructure solutions - Page 16
chassis connects directly to the Intelligent PDU core with C19-to-C20 jumper cables with data lines.
View all HP 22.1kVA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 16 highlights
Figure 19 shows the power distribution setup with four Intelligent PDUs (two primary/secondary pairs) directly supporting four HP c-Class BladeSystem chassis in two power zones. As noted earlier, the Intelligent Extension Bars are not used in this configuration. The HP ProLiant c-Class BladeSystem chassis connects directly to the Intelligent PDU core with C19-to-C20 jumper cables with data lines. Figure 19. Dual zone power distribution for HP c-Class BladeSystem chassis 16
16
Figure 19 shows the power distribution setup with four Intelligent PDUs (two primary/secondary pairs)
directly supporting four HP c-Class BladeSystem chassis in two power zones. As noted earlier, the
Intelligent Extension Bars are not used in this configuration. The HP ProLiant c-Class BladeSystem
chassis connects directly to the Intelligent PDU core with C19-to-C20 jumper cables with data lines.
Figure 19.
Dual zone power distribution for HP c-Class BladeSystem chassis