HP DL580 3-7U Quick Deploy Rail System Installation Instructions - Page 7
Preparing the rails for integrated shipping in a rack
UPC - 882780616011
View all HP DL580 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 7 highlights
IMPORTANT: When converting the cable arm, always be sure to orient the arm with the cable trough facing upward. The cable management arm is ready for installation on the rack. Preparing the rails for integrated shipping in a rack IMPORTANT: You must provide screws to secure the slide mounting bracket assemblies in a threaded-hole rack.
IMPORTANT:
When converting the cable arm,
always be sure to orient the arm with the cable trough
facing upward.
The cable management arm is ready for installation on
the rack.
Preparing the rails for
integrated shipping in a rack
IMPORTANT:
You must provide screws to secure
the slide mounting bracket assemblies in a
threaded-hole rack.