HP Designjet L26500 HP Designjet L26500 Printer series - Site preparation guid - Page 12
Site preparation checklist
View all HP Designjet L26500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 12 highlights
3 Site preparation checklist Checklist Safety requirements Do those who will operate the printer have the technical training and experience necessary to be aware of hazards to which they may be exposed in performing a task, and to take appropriate measures to minimize the risks? Is there an emergency exit in the print production area, with easy access and free from any obstruction? Yes No (Required) Comments Electrical installation requirements Yes No Comments Is the electrician aware of all requirements and specifications highlighted in this guide? (Required) Is the single-phase line voltage inside the specified voltage range (220-240 V~ (-10%, +6%))? (Required) The tri-phase 208 V or 200 V power systems (voltage line-to-line) require a step-up transformer. Specify nominal mains voltage: Are there two dedicated lines to connect the printer's two power cords? NOTE: Do not use a power strip (relocatable power tap) to connect both power cords. (Required) Have branch circuit breakers (2 poles, 16 A general or 20 A for NEMA 6-20R only) been correctly installed for each dedicated line? (Required) Has the single-phase branch circuit breaker (2 poles, 20 A) been correctly installed? (Required) Is the Power Distribution Unit (PDU) correctly installed? (Required) Are the grounding conductors properly installed for each wall receptacle (wall socket)? (Required) Are the wall receptacles (wall sockets) suitable for the power cord plug type provided by HP? (Required) Are the wall receptacles (wall sockets) and electrical installation suitable for the printer's rated current ? NOTE: The printer's rated current is 15 A. (Required) 8 Chapter 3 Site preparation checklist ENWW