HP Integrity rx4640 Generic Site Preparation Guide, Fourth Edition - Page 32
Delivery Survey, Table 1-7 Site Inspection Checklist
View all HP Integrity rx4640 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 32 highlights
Table 1-7 Site Inspection Checklist (continued) Check either Yes or No. If No, include comment number or date. 15a. Is dual source power used? If so, identify types and evaluate grounding. 16. Does the input frequency correspond to equipment specifications? 17. Are lightning arrestors installed inside the building? 18. Is power conditioning equipment installed? 19. Is a dedicated branch circuit available for equipment? 20. Is the dedicated branch circuit less than 75 feet (22.86 m)? 21. Are the input circuit breakers adequate for equipment loads? Safety Number Area or Condition Yes No 22. Is an emergency power shutoff switch available? 23. Is a telephone available for emergency purposes? 24. Does the computer room have a fire protection system? 25. Does the computer room have antistatic flooring installed? 26. Do any equipment servicing hazards exist (loose ground wires, poor lighting, and so on)? Cooling Number Area or Condition Yes No 27. Can cooling be maintained between 5°C (41 °F) and 35°C (95 °F) (up to 1,525 m/5,000 ft)? Derate 1°C/305 m (34 °F/1,000 ft) above 1,525 m/5,000 ft and up to 3,048 m/10,000 ft. 28. Can temperature changes be held to 5°C (41 °F) per hour with tape media? Can temperature changes be held to 20°C (68 °F) per hour without tape media? 29. Can humidity level be maintained at 40% to 55% at 35°C (95 °F) noncondensing? 30. Are air-conditioning filters installed and clean? Storage Number Area or Condition Yes No 31. Are cabinets available for tape and disc media? 32. Is shelving available for documentation? Training Number Area or Condition 33. Are personnel enrolled in the System Administrator's Course? 34. Is on-site training required? Comment or Date Delivery Survey The delivery survey forms list delivery or installation requirements. If any of the items on the list apply, enter the appropriate information (Figure 1-13 (page 33) and Figure 1-14 (page 34)) in the areas provided on the form. 32 General Site Preparation Guidelines