HP Integrity rx7620 Generic Site Preparation Guide, Fourth Edition - Page 30
Example of an Installation Schedule, Sample Site Inspection Checklist, Formulas
View all HP Integrity rx7620 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 30 highlights
- 1 ft. = 0.305 meters - 1 CFM = 1.7m3/hour • kVA conversions Three phase kVA = V × A × √3 / 1000 • Single phase kVA = V × A / 1000 Formulas • kVA = voltage × current (amps) • Watts = VA × PF • Btu = Watts × 3.41 • ºC = (32 + 1.8a) ºF Example of an Installation Schedule The following schedule lists the sequence of events for a typical system installation: • Sixty days before installation - Floor plan design is completed and mailed to HP (if required to be an HP task). • Thirty days before installation - Primary power and air-conditioning installation are completed. - Telephone and data cables are installed. - Fire protection equipment is installed. - Major facility changes are completed. - Special delivery requirements are defined. - Site inspection checklist is completed. See Table 1-6 and Table 1-7 (page 31) for sample customer information forms and site inspection checklists. - Delivery survey is completed. See Figure 1-13 (page 33) and Figure 1-14 (page 34) for a sample delivery survey. - A signed copy of the site inspection and delivery survey is mailed to HP. - Site inspection and predelivery coordination meeting is arranged with an HP representative to review the inspection checklist and to arrange an installation schedule. • Seven days before installation - Final check is made with an HP site preparation specialist to resolve any last-minute problems. NOTE: Not all installations follow a schedule like the one previously noted. Sometimes a server is purchased through another vendor, which can preclude a rigid schedule. Other conditions could also prevent following this schedule. For those situations, consider a milestone schedule. • Site Preparation-Schedule with the customer as soon as possible after the order is placed. • Site Verification-Schedule with the customer a minimum of one to two days before the product is scheduled to be installed. Sample Site Inspection Checklist See Table 1-6 and Table 1-7 (page 31). They may be used to measure your progress. 30 General Site Preparation Guidelines