HP Latex 315 Site Preparation Guide - Page 20
Site preparation checklist, Networking and computer requirements, Comments
View all HP Latex 315 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 20 highlights
Networking and computer requirements Is the RIP computer and software ready for installation? Have network connections been supplied? Do you need a web proxy? If so, write down proxy server name and port. Do you have a color sensor that is compatible with your RIP? Do you have a LAN cable long enough to connect the printer to the network? Yes No Comments Environmental requirements Have the temperature and humidity requirements been satisfactorily met in the print production area, and is there adequate ventilation or air conditioning? Have the temperature and humidity requirements been satisfactorily met in the storage area? Is the print production area free from dirt and dust? Does the print production area have sufficient lighting? Does the printing room meet HP recommended minimal ventilation? Yes No (Required) Comments Other requirements Yes Have you arranged for supplies such as substrate and ink cartridges to be available on the day of installation? Have you met the requirements specified in this guide? No (Required) Comments Date of site preparation completion Site preparation guide edition number or copyright date Customer signature 16 Chapter 3 Site preparation checklist ENWW