HP Latex 3600 Site Preparation Checklist - Page 6

Checklist, Are Residual-Current Circuit Breakers RCCB, also known as Ground Fault Circuit

Page 6 highlights

Electrical installation Has the site been prepared for the chosen power option? Yes No Configuration 1 branch circuit breaker: 4 poles, 40/50 A Configuration 2 branch circuit breaker: 3 poles, 63/70 A Configuration 3 branch circuit breaker: ● Three-phase: 4 poles, 40/50 A ● Two-phase control: 2 poles, 15/16/20 A Configuration 4 branch circuit breaker: ● Three-phase: 3 poles, 63/70 A ● Two-phase control: 2 poles, 15/16/20 A Configuration 5 branch circuit breaker: 2 poles, 90 A Configuration 6 branch circuit breaker: ● Two-phase: 2 poles, 90 A ● Two-phase control: 2 poles, 15/16/20 A Is the chosen power system within its nominal range? Configuration 1 Configuration 2 Configuration 3 Configuration 4 Configuration 5 Configuration 6 Is the grounding conductor properly installed, as shown in the site preparation guide? Have you booked the services of an electrician for the day of installation? Is the electrician aware of all requirements and specifications highlighted in this document? Is the Power Distribution Unit (PDU) correctly installed? Are Residual-Current Circuit Breakers (RCCB), also known as Ground Fault Circuit Interrupters (GFCI), required by local laws? if so, have they a sensitivity of 100 mA or higher? Electrical configuration Yes No Do you need an Uninterrupted Power Supply (UPS)? If so, is it correctly installed? No power cords are supplied with the printer; does the electrician understand that power cord(s) must be provided according to printer specifications and local laws? If local regulations specify that you must use electrical plugs to connect the printer to the power supply, does the electrician have the required plugs ready for installation? 4 Chapter 2 Checklist Comments (Required) (Required) (Required) (Required) (Required) (Required) Comments ENWW

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Electrical installation
Yes
No
Comments
Has the site been prepared for the chosen power option?
Configuration 1 branch circuit breaker: 4 poles, 40/50 A
Configuration 2 branch circuit breaker: 3 poles, 63/70 A
Configuration 3 branch circuit breaker:
Three-phase: 4 poles, 40/50 A
Two-phase control: 2 poles, 15/16/20 A
Configuration 4 branch circuit breaker:
Three-phase: 3 poles, 63/70 A
Two-phase control: 2 poles, 15/16/20 A
Configuration 5 branch circuit breaker: 2 poles, 90 A
Configuration 6 branch circuit breaker:
Two-phase: 2 poles, 90 A
Two-phase control: 2 poles, 15/16/20 A
(Required)
Is the chosen power system within its nominal range?
Configuration 1
Configuration 2
Configuration 3
Configuration 4
Configuration 5
Configuration 6
(Required)
Is the grounding conductor properly installed, as shown in the site preparation
guide?
(Required)
Have you booked the services of an electrician for the day of installation?
(Required)
Is the electrician aware of all requirements and specifications highlighted in this
document?
(Required)
Is the Power Distribution Unit (PDU) correctly installed?
(Required)
Are Residual-Current Circuit Breakers (RCCB), also known as Ground Fault Circuit
Interrupters (GFCI), required by local laws? if so, have they a sensitivity of 100
mA or higher?
Electrical configuration
Yes
No
Comments
Do you need an Uninterrupted Power Supply (UPS)? If so, is it correctly installed?
No power cords are supplied with the printer; does the electrician understand
that power cord(s) must be provided according to printer specifications and local
laws?
If local regulations specify that you must use electrical plugs to connect the
printer to the power supply, does the electrician have the required plugs ready
for installation?
4
Chapter 2
Checklist