HP Scitex LX600 HP Scitex LX Printer Family - Site preparation guide - Page 9
System operation requirements, Electrical configuration
View all HP Scitex LX600 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 9 highlights
Site preparation HP Scitex Caldera RIP ● Server Administration (Server, Configure, connection) ● GrandRip+ (Main, Tool, settings) ● Spooler ● Image Work Directory (Image Positioning and scale setting on the page, and so on) Profile creation will not be covered. System operation requirements Electrical configuration NOTE: An electrician is required for the setup and configuration of the building electrical system used to power the printer and also for printer installation. Make sure that your electrician is appropriately certified according to local regulations and supplied with all the information regarding the electrical configuration. Your printer requires the following electrical components to be supplied and installed by the customer, according to the Electrical Code requirements of the local jurisdiction of the country where the equipment is installed. 1. Printer electrical cabinet 2. Uninterruptible Power Supply (UPS) for single-phase line (recommended) 3. Power Distribution Unit (PDU) including single-phase branch circuit breaker 4. Power Distribution Unit (PDU) including three-phase branch circuit breaker 5. HP Internal Print Server computer NOTE: Remember that you are required to follow the local laws, regulations, and standards that pertain to the electrical installation of your printer. NOTE: The LX600 printer is supplied with a 5-m (16-ft) three-phase cable, already connected within the electrical cabinet, but without connectors at the other end. The LX800 is not supplied with a threephase cable. ENWW System operation requirements 5