HP Stitch S1000 Site Preparation Guide - Page 29

Installation checklist

Page 29 highlights

4 Installation checklist Address information Company name Street address City Country Contact persons Company engineer or technician System administrator Operators to be trained in the use and maintenance of the printer Postal code Telephone Fax Email Name Telephone Email Printer HP Stitch S1000 126in General access & equipment unloading Yes No Is there an easily accessible unloading area, with sufficient space to unload and maneuver the equipment? Has the route to the installation area been checked to meet all requirements (height, width, and clearance of ceilings, doorways, ramps, and corridors) and is the conveyance route clear? Is a power outlet available near the site where you plan to disassemble the crate (for the electric screwdriver used to disassemble the crate)? Have specialist movers been contracted to unload and move the equipment on the date required? Are the specialist movers aware of the specifications provided in this document? Is there enough space and manpower required to download the printer with the ramps? If a forklift is needed to unload the printer, has a suitable one been contracted for installation? ENWW Comments 25

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34

4
Installation checklist
Address information
Company name
Postal code
Street address
Telephone
City
Fax
Country
Email
Contact persons
Name
Telephone
Email
Company engineer or technician
System administrator
Operators to be trained in the use and
maintenance of the printer
Printer
HP Stitch S1000 126in
General access & equipment unloading
Yes
No
Comments
Is there an easily accessible unloading area, with sufficient space to unload and
maneuver the equipment?
Has the route to the installation area been checked to meet all requirements
(height, width, and clearance of ceilings, doorways, ramps, and corridors) and is the
conveyance route clear?
Is a power outlet available near the site where you plan to disassemble the crate
(for the electric screwdriver used to disassemble the crate)?
Have specialist movers been contracted to unload and move the equipment on the
date required?
Are the specialist movers aware of the specifications provided in this document?
Is there enough space and manpower required to download the printer with the
ramps?
If a forklift is needed to unload the printer, has a suitable one been contracted for
installation?
ENWW
25