HP Stitch S500 Site Preparation Guide - Page 18

Site preparation checklist, Electrical, requirements, Comments - specs

Page 18 highlights

Electrical configuration requirements Yes No Do you need an Uninterrupted Power Supply (UPS) or step-up transformer? If so, is it correctly installed? Comments Networking and computer requirements Is the RIP computer and software ready for installation? Have network connections been supplied as per spec? Do you need a web proxy? If so, write down proxy server name and port. Do you have a color sensor that is compatible with your RIP? Do you have a LAN cable long enough to connect the printer to the network? Yes No Comments Environmental requirements Have the temperature and humidity requirements been satisfactorily met in the print production area? Have the temperature and humidity requirements been satisfactorily met in the storage area? Is the print production area free from dirt and dust? Does the print production area have sufficient lighting? Have you met the ventilation and air conditioning requirements specified in this guide? Yes No (Required) Comments Other requirements Yes Have you arranged for supplies such as substrate and ink cartridges to be available on the day of installation? Do you have a spectrophotometer that is compatible with your RIP? Have you met the requirements specified in this guide? No (Required) Comments 14 Chapter 3 Site preparation checklist ENWW

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20

Electrical
configuration
requirements
Yes
No
Comments
Do you need an Uninterrupted Power Supply (UPS) or step-up transformer? If so, is
it correctly installed?
Networking and computer requirements
Yes
No
Comments
Is the RIP computer and software ready for installation?
Have network connections been supplied as per spec?
Do you need a web proxy? If so, write down proxy server name and port.
Do you have a color sensor that is compatible with your RIP?
Do you have a LAN cable long enough to connect the printer to the network?
Environmental requirements
Yes
No
Comments
Have the temperature and humidity requirements been satisfactorily met in the
print production area?
Have the temperature and humidity requirements been satisfactorily met in the
storage area?
Is the print production area free from dirt and dust?
Does the print production area have
sufficient
lighting?
Have you met the ventilation and air conditioning requirements
specified
in this
guide?
(Required)
Other requirements
Yes
No
Comments
Have you arranged for supplies such as substrate and ink cartridges to be available
on the day of installation?
Do you have a spectrophotometer that is compatible with your RIP?
Have you met the requirements
specified
in this guide?
(Required)
14
Chapter 3
Site preparation checklist
ENWW