HP Stitch S500 Site Preparation Guide - Page 18
Site preparation checklist, Electrical, requirements, Comments - specs
View all HP Stitch S500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 18 highlights
Electrical configuration requirements Yes No Do you need an Uninterrupted Power Supply (UPS) or step-up transformer? If so, is it correctly installed? Comments Networking and computer requirements Is the RIP computer and software ready for installation? Have network connections been supplied as per spec? Do you need a web proxy? If so, write down proxy server name and port. Do you have a color sensor that is compatible with your RIP? Do you have a LAN cable long enough to connect the printer to the network? Yes No Comments Environmental requirements Have the temperature and humidity requirements been satisfactorily met in the print production area? Have the temperature and humidity requirements been satisfactorily met in the storage area? Is the print production area free from dirt and dust? Does the print production area have sufficient lighting? Have you met the ventilation and air conditioning requirements specified in this guide? Yes No (Required) Comments Other requirements Yes Have you arranged for supplies such as substrate and ink cartridges to be available on the day of installation? Do you have a spectrophotometer that is compatible with your RIP? Have you met the requirements specified in this guide? No (Required) Comments 14 Chapter 3 Site preparation checklist ENWW