HP StorageWorks 2000fc HP StorageWorks Carrier-Grade Enclosure installation in - Page 1
HP StorageWorks 2000fc - G2 Modular Smart Array Manual
View all HP StorageWorks 2000fc manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 1 highlights
HP StorageWorks Carrier-Grade Enclosure installation instructions Cable information This section provides cabling information for installing the HP StorageWorks Dual I/O 2.5" DC-power Drive Enclosure. NOTE: This carrier-grade product is intended for use in both common bonding networks and isolated bonding networks. This document provides specific information regarding the carrier-grade versions of the HP StorageWorks Dual I/O 2.5" DC-power Drive Enclosure. NEBS chassis ground There are two grounding methods that can be used when installing the HP StorageWorks Dual I/O 2.5" DC-power Drive Enclosure: • Using a single wire coming from the front of the chassis ears • Using a cable from the power supply Installation and grounding instructions - single wire method 1. Attach the rear brackets to the Carrier-Grade Enclosure. © Copyright 1999, 2009 Hewlett-Packard Development Company, L.P. First edition: October 2009 The information in this document is subject to change without notice. Printed in the US www.hp.com 2. Attach the left bracket assembly to the left rack rail. 3. Attach the right bracket assembly to the right rack rail. 4. Insert cage nuts into the rack holes. 5. Align the Carrier-Grade Enclosure with the rails, and then slide it into the rack until the ears of the enclosure are about 1 to 2 inches from the rack front rails. 6. Attach a flat washer between the right mounting ear (bottom hole) and the rack, and then loosely attach the bracket to the rear bracket assemblies. *589728-001* Page 1