HP StorageWorks XP512 HP SureStore E Disk Array XP512 Site Prep Guide - Page 3

Contents, Introduction, The Site Prep Team and Tasks, Preparing for Installation

Page 3 highlights

CONTENTS Revision History 7 Updates 8 1 Introduction 9 2 The Site Prep Team and Tasks 11 The Site Prep Team 12 The HP Sales Representative (SR) 12 The HP Customer Engineer (CE) 12 The HP Application Software Engineer (ASE) 12 The Customer 13 Site Prep Technical Tasks 14 Site Planning Timetable 16 3 Preparing for Installation 17 Safety Requirements 18 Site Safety Consideration 18 Fire Safety 18 Equipment Servicing Hazards 18 General Computer Room Requirements 19 Space planning 19 The HP SureStore E Disk Array XP512 20 3

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76

3
Revision History
7
Updates
8
1
Introduction
9
2
The Site Prep Team and Tasks
11
The Site Prep Team
12
The HP Sales Representative (SR)
12
The HP Customer Engineer (CE)
12
The HP Application Software Engineer (ASE)
12
The Customer
13
Site Prep Technical Tasks
14
Site Planning Timetable
16
3
Preparing for Installation
17
Safety Requirements
18
Site Safety Consideration
18
Fire Safety
18
Equipment Servicing Hazards
18
General Computer Room Requirements
19
Space planning
19
The HP SureStore E Disk Array XP512
20
CONTENTS