HP Surestore SC10 User and Service Guide Addendum - Page 16
Preparation, Electrical Requirements
View all HP Surestore SC10 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 16 highlights
Table 2-1 CAUTION Installation (HP-Qualified Personnel Only) Preparation Preparation Before installing the disk system, make sure: 1. Electrical wiring and breakers meet power needs. 2. The required support software is installed on the host. Electrical Requirements All electrical wiring to the service point (plug) must be sized to carry the following inrush and steady state currents: Maximum Operating Current Input Voltage and Current -40Vdc to - 72Vdc volts, 19 Amperes rating Maximum DC Power Drawn 450 Watts by One Disk System Adding disk systems to circuits rapidly increases current requirements. Always make sure that the total current drawn does not exceed circuit capacity. CAUTION The disk system must be fused to a 19 Ampere Fuse between the DC power source and the DC power input cable to the DC power supply in the disk system. 16 Chapter 2