Hitachi H65SD2 Instruction Manual - Page 14
Service and repairs, Service parts list
UPC - 717709010093
View all Hitachi H65SD2 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 14 highlights
English ⅜ Grease Replacement Period Inspect the grease amount according to the timing replacement period of the carbon brush. (See item 4 in the section MAINTENANCE AND INSPECTION.) Ask for grease replacement at the nearest authorized service center. NOTE: ⅜ The Hitachi Electric Hammer Grease A is of the low viscosity type. When the grease is consumed, purchase from the authorized service center. ⅜ Do not excessively supply the designated amount of grease. Otherwise, this demolition hammer should not operate accurately. 7. Service and repairs All quality power tools will eventually require servicing or replacement of parts because of wear from normal use. To assure that only authorized replacement parts will be used, all service and repairs must be performed by a authorized service center, ONLY. 8. Service parts list CAUTION: Repair, modification and inspection of Hitachi Power Tools must be carried out by a HITACHI AUTHORIZED SERVICE CENTER. This Parts List will be helpful if presented with the tool to the HITACHI AUTHORIZED SERVICE CENTER when requesting repair or other maintenance. In the operation and maintenance of power tools, the safety regulations and standards prescribed in each country must be observed. MODIFICATIONS: Hitachi Power Tools are constantly being improved and modified to incorporate the latest technological advancements. Accordingly, some parts may be changed without prior notice. 14