Hitachi W6VB3 Instruction Manual - Page 10
Assembly And Operation
View all Hitachi W6VB3 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 10 highlights
English ASSEMBLY AND OPERATION APPLICATIONS ⅜ Tightening hex. head screws ⅜ Tightening Drywall screws, wood screws and self-drilling screws NOTE: For tightening the Self-drilling screws, sub-stopper (B) and non-magnetic bit holder (sold separately) are recommended. PRIOR TO OPERATION 1. Power source Ensure that the power source to be utilized conforms to the power source requirements specified on the product nameplate. 2. Power switch Ensure that the switch is in the OFF position. If the plug is connected to a receptacle while the switch is in the ON position, the power tool will start operating immediately and can cause serious injury. 3. Extension cord When the work area is far away from the power source, use an extension cord of sufficient thickness and rated capacity. The extension cord should be kept as short as practicable. WARNING: Damaged cord must be replaced or repaired. 4. Check the receptacle If the receptacle only loosely accepts the plug, the receptacle must be repaired. Contact a licensed electrician to make appropriate repairs. If such a fautly receptacle is used, it may cause overheating, resulting in a serious hazard. 5. Confirming condition of the environment Confirm that the work site is placed under appropriate conditions conforming to prescribed precautions. 10