Hunter 83003 Owner's Manual - Page 8
New Construction - suspended between joists
View all Hunter 83003 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 8 highlights
New Construction - suspended between joists B11 B12 F E Slide the mounting rails into brackets. 5/8 5/8 1/2 1/2 Position the correct depth mark at the bottom edge of the joist based on the thickness of your sheetrock. B13 B14 F 1/8" bit Mark position of screws by using holes as a template. Drill a hole in the center of each outline. B15 B16 Insert screws, leaving space between the screw head and the joist. Screws are not provided. 41953-01 02/15/2008 Attach the rails onto the screws. 023_41953_EngS_2-15-08.indd 8 2/16/08 12:25:33 PM
41953-01
02/15/2008
8
Slide the mounting rails into brackets.
Mark position of screws by using holes as a template.
Insert screws, leaving space between the screw
head and the joist. Screws are not provided.
B11
E
F
5/8
1/2
5/8
1/2
B12
1/8” bit
B14
B15
B16
F
B13
Position the correct depth mark at the bottom edge of
the joist based on the thickness of your sheetrock.
Drill a hole in the center of each outline.
Attach the rails onto the screws.
New Construction – suspended between joists
023_41953_EngS_2-15-08.indd
8
2/16/08
12:25:33 PM