IBM 84892MU Installation Guide - Page 96

Ethernet, Inactive

Page 96 highlights

any buttons within 60 seconds, the menu changes to display the charging progress. You can switch the front-panel display to the menu at any time by pressing the select button again. 5. Press and release the up button or down button until the Node: option is displayed on the first line of the front-panel display. 6. Verify that the node number that is displayed on the second line of the front-panel display is the same as the node number that is printed on the front panel of the node. Figure 46 shows how the node number is displayed on the front panel. If the node number is not the same, contact the IBM Support Center. Node: xxxxxx Figure 46. Node number 7. Press and release the up button or down button until the Ethernet option is shown on the front-panel display. The second line of the front-panel display in Figure 47 shows the message Inactive. This message indicates that, although an Ethernet connection is available, it cannot yet be used. Ethernet: Inactive Figure 47. Ethernet mode 8. Press and release the up button or down button until the FC Port-1 option shows in the display. 9. Check whether the second line of the front-panel display shows the message Active. If Active is not shown on the second line, go to "MAP 5600: Fibre channel" in the IBM System Storage SAN Volume Controller Service Guide to repair the fault. 10. Press and release the left or right button to display the other port options. Check whether for each port, the second line of the front-panel display shows the message Active. If Active is not shown for any port, go to "MAP 5600: Fibre channel" in the IBM System Storage SAN Volume Controller Service Guide to repair the fault. 11. If the configuration data table provided by the user indicates that the SAN Volume Controller nodes are to be operated at 1 Gbps, follow these steps: a. Press and hold the down button. b. Press and release the select button. c. Release the down button. The second line of the front-panel display shows the current fibre-channel speed setting of the node. Press the up or down button until 1 Gbps is displayed and then press the select button. This changes the fibre-channel speed for all ports on this node to 1 Gbps. 12. If you want to select a language other than English, perform the following steps: a. Press the up or down button until Select Language? is displayed. b. Press the select button. 56

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141

any
buttons
within
60
seconds,
the
menu
changes
to
display
the
charging
progress.
You
can
switch
the
front-panel
display
to
the
menu
at
any
time
by
pressing
the
select
button
again.
5.
Press
and
release
the
up
button
or
down
button
until
the
Node:
option
is
displayed
on
the
first
line
of
the
front-panel
display.
6.
Verify
that
the
node
number
that
is
displayed
on
the
second
line
of
the
front-panel
display
is
the
same
as
the
node
number
that
is
printed
on
the
front
panel
of
the
node.
Figure
46
shows
how
the
node
number
is
displayed
on
the
front
panel.
If
the
node
number
is
not
the
same,
contact
the
IBM
Support
Center.
7.
Press
and
release
the
up
button
or
down
button
until
the
Ethernet
option
is
shown
on
the
front-panel
display.
The
second
line
of
the
front-panel
display
in
Figure
47
shows
the
message
Inactive
.
This
message
indicates
that,
although
an
Ethernet
connection
is
available,
it
cannot
yet
be
used.
8.
Press
and
release
the
up
button
or
down
button
until
the
FC
Port-1
option
shows
in
the
display.
9.
Check
whether
the
second
line
of
the
front-panel
display
shows
the
message
Active
.
If
Active
is
not
shown
on
the
second
line,
go
to
“MAP
5600:
Fibre
channel”
in
the
IBM
System
Storage
SAN
Volume
Controller
Service
Guide
to
repair
the
fault.
10.
Press
and
release
the
left
or
right
button
to
display
the
other
port
options.
Check
whether
for
each
port,
the
second
line
of
the
front-panel
display
shows
the
message
Active
.
If
Active
is
not
shown
for
any
port,
go
to
“MAP
5600:
Fibre
channel”
in
the
IBM
System
Storage
SAN
Volume
Controller
Service
Guide
to
repair
the
fault.
11.
If
the
configuration
data
table
provided
by
the
user
indicates
that
the
SAN
Volume
Controller
nodes
are
to
be
operated
at
1
Gbps,
follow
these
steps:
a.
Press
and
hold
the
down
button.
b.
Press
and
release
the
select
button.
c.
Release
the
down
button.
The
second
line
of
the
front-panel
display
shows
the
current
fibre-channel
speed
setting
of
the
node.
Press
the
up
or
down
button
until
1
Gbps
is
displayed
and
then
press
the
select
button.
This
changes
the
fibre-channel
speed
for
all
ports
on
this
node
to
1
Gbps.
12.
If
you
want
to
select
a
language
other
than
English,
perform
the
following
steps:
a.
Press
the
up
or
down
button
until
Select
Language?
is
displayed.
b.
Press
the
select
button.
Node:
xxxxxx
Figure
46.
Node
number
Ethernet:
Inactive
Figure
47.
Ethernet
mode
56