Insignia NS-CZ50WH0 User Guide - Page 6
Features, Package contents, Setting up your freezer, Before using your freezer
View all Insignia NS-CZ50WH0 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 6 highlights
NS-CZ50WH0/NS-CZ50WH0-C/ NS-CZ70WH0/NS-CZ70WH0-C Features Package contents • 5 or 7 cubic foot chest freezer • Storage basket • Ice shovel (for removing ice build up inside your freezer) • User Guide F Door handle (optional) Hinge Lamp (optional) Storage basket Cabinet Drainage hole Power cord Ventilation cover Temperature control panel Setting up your freezer Before using your freezer • Remove the exterior and interior packing. • Let your freezer stand upright for approximately two hours before connecting it to power. This reduces the possibility of a malfunction in the cooling system from incorrect handling of your freezer during transportation. • Wash the inside with a damp, warm cloth and a baking soda solution (two tablespoons in a quart of water), then wipe dry with a dry cloth. Do this periodically to keep your freezer looking new. Finding a suitable location • Your freezer is designed to be free standing only, and should not be recessed or built-in. • Place your freezer on a floor that is strong enough to support your freezer when it is fully loaded. • Allow 6 inches (15 cm) of space between the back and sides of your freezer and any surrounding walls to provide correct air ventilation. Adjust the feet to keep your freezer leveled. 6 www.insigniaproducts.com