Intel P4000GP S2400GP/P4000GP family Service Guide - Page 77
Installing the 8x2.5 Hot-Swap Hard Drive Cage Assembly, x2.5 Hot Swap
View all Intel P4000GP manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 77 highlights
Hardware Installations and Upgrades 5. Install the 8x2.5" Hot-Swap Hard Drive Cage. A. Slide the 8x2.5" Hot-Swap Drive Cage into the slot (see letter A). B. Secure the Hard Drive Cage with the Screw (see letter B). Figure 95. Installing the 8x2.5" Hot-Swap Hard Drive Cage Assembly 6. Make the backplane and server board/RAID controller card cable connections. Refer to the documentation that came with your server board and/or RAID controller card for instructions on connecting backplane cables to your server board or RAID controller card. A. Connect an I2C_IN cable (letter A) B. Connect MiniSAS data cables (letter B) C. Connect power cable (letter C) Figure 96. 8x2.5" Hot Swap Backplane Cable Connections 7. Install the front bezel. For instructions, see Installing the Front Bezel. 8. Install the air duct if the air duct is removed. For instructions, see Installing the Airduct 9. Install the chassis cover. For instructions, see Installing the System Side Cover. 10. Plug all peripheral devices and the AC power cable into the server. Intel® Server Board S2400GP Intel® Server System P4000GP Family Service Guide 61