Intel R1000GL Service Guide - Page 27
For system with 8 x 2.5 hard drive bay
View all Intel R1000GL manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 27 highlights
Hardware Installations and Upgrades For system with 8 x 2.5" hard drive bay: Note: To activate the port SCU1 (4-7) on the server board, a proper Intel® RAID C600 Upgrade Key must be installed. For instructions, see Intel® RAID C600 Upgrade Key Installation Guide. Note: An optical drive can be installed to replace the Front Panel I/O. Figure 17. Cable Routing - 8 x 2.5" HDD Intel®® Server System R1000GZ/GL Service Guide 15
Hardware Installations and Upgrades
Intel
®®
Server System R1000GZ/GL Service Guide
15
For system with 8 x 2.5” hard drive bay:
Note:
To activate the port SCU1 (4-7) on the server board, a proper Intel
®
RAID C600 Upgrade
Key must be installed. For instructions, see Intel
®
RAID C600 Upgrade Key Installation Guide.
Note:
An optical drive can be installed to replace the Front Panel I/O.
Figure 17. Cable Routing – 8 x 2.5” HDD