KitchenAid KFGS366VSS Installation Guide - Page 2
Installation Requirements
UPC - 883049132754
View all KitchenAid KFGS366VSS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 2 highlights
WARNING: If the information in this manual is not followed exactly, a fire or explosion may result causing property damage, personal injury or death. - Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance. - WHAT TO DO IF YOU SMELL GAS: • Do not try to light any appliance. • Do not touch any electrical switch. • Do not use any phone in your building. • Immediately call your gas supplier from a neighbor's phone. Follow the gas supplier's instructions. • If you cannot reach your gas supplier, call the fire department. - Installation and service must be performed by a qualified installer, service agency or the gas supplier. WARNING: Gas leaks cannot always be detected by smell. Gas suppliers recommend that you use a gas detector approved by UL or CSA. For more information, contact your gas supplier. If a gas leak is detected, follow the "What to do if you smell gas" instructions. In the State of Massachusetts, the following installation instructions apply: ■ Installations and repairs must be performed by a qualified or licensed contractor, plumber, or gasfitter qualified or licensed by the State of Massachusetts. ■ If using a ball valve, it shall be a T-handle type. ■ A flexible gas connector, when used, must not exceed 3 feet. INSTALLATION REQUIREMENTS Tools and Parts Gather the required tools and parts before starting installation. Tools needed Parts supplied ■ Gas pressure regulator ■ Tape measure ■ Wrench or pliers ■ Burner grates ■ Flat-blade screwdriver ■ Needle-nose pliers ■ Burner caps 0 [2 mm]) flat blade ■ Marker or pencil screwdriver (screwdriver shaft must be a minimum of ■ 2" [5.1 cm] long) Pipe-joint compound resistant to LP gas combination wrench ■ Noncorrosive leak-detection solution ■ Pipe wrench ■ Clamping brackets (2) ■ 2¹⁄₂" (6.4 cm) clamping screws (2) Parts needed Check local codes and consult gas supplier. Check existing gas supply and electrical supply. See "Electrical Requirements" and "Gas Supply Requirements" sections. 2