LG LWHD1807HR Owners Manual - Page 13

Ins_llation

Page 13 highlights

Ins_llation S,CREWDR|VER(+,,-), RULER, KN|FE, HAMMER, PENCIL, LEVEL PREPARATION OF CHASSIS 1. Remove the _rews which _asten the cabinet at both _des ,and at the back_ Shipping screws 2. Slide the unit out from the cabinet by gdppingl the base pan handle and pulling_ard while bracing the cabinet, 3. C_ the win_w sash _al to the proper length,, Peel off the backing and ,attach the Foam°PE to the un_r_de of the window sash. Fig. 1 4,. Remove the backing from _am-PE with 3, holes and attach it to, the _ttom o_the Top retainer bar, 5, Attach the, "Topretainer bar on the top of the cabinet w_ 3 screws (T_,,peA) 6. In_rt the Frame guides into,the bottom of the cabinet, 7. Inert the Frame Curtain into the Top retainer bar and Frame guides. Foam-PE .F...op retainer bar Top relainer bar 8,, Fasten the, curtains to the, unit with 10 screws (Type A) at _th sides. S_,_ (TypeA) "Fr&m e guide Screw(Tyt_ A) Owner_ Manual 13

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88

Ins_llation
S,CREWDR|VER(+,,-),
RULER,
KN|FE,
HAMMER,
PENCIL,
LEVEL
PREPARATION
OF
CHASSIS
1. Remove the _rews
which _asten the cabinet at
both _des ,and
at
the back_
2. Slide the unit out from
the
cabinet by gdppingl
the base pan handle
and
pulling
_ard
while
bracing
the
cabinet,
3.
C_ the win_w
sash _al
to the proper length,,
Peel off the backing and ,attach the FoamĀ°PE
to
the un_r_de
of the window sash.
Shipping screws
Fig. 1
4,. Remove the backing from _am-PE
with 3, holes
and attach
it
to, the _ttom
o_the Top retainer
bar,
5, Attach the,
"Top
retainer bar on the top of the
cabinet
w_
3
screws(T_,,peA)
6.
In_rt
the Frame guides
into,
the bottom of the
cabinet,
7. Inert
the Frame Curtain into
the
Top retainer bar
and Frame guides.
8,,Fasten the,curtains to the,unit with 10 screws
(Type A) at _th
sides.
Top relainer bar
Foam-PE
....
Fop retainer bar
S_,_
(TypeA)
"Fr&m e guide
Screw(Tyt_
A)
Owner_
Manual
13