LG MA840B Service Manual - Page 18

Components

Page 18 highlights

WARNING • FOR CONTINUED PROTECTION AGAINST EXCESSIVE RADIATION EMISSION, REPLACE ONLY WITH IDENTICAL REPLACEMENT PARTS TYPE NO.SZM-V 16-FA-63 OR VP-533A-OF FOR PRIMARY SWITCH TYPE NO SZM-V 1G-FA-G2 OR VP-532A-OF FOR MONITOR SW TCH TYPF NO S7M-V 16-FA-63 OR VP-533A-OF FOR SFCONDARY SWITCH Whcn the door release button is dcprcsscd slowly with the door c osed, an audib e click should be isconnect me wire lean rrom me secon ary switch heard at the same time or successively at intervals. When the button is released slowly, the (COM) and normally open (NO) terminals of the t h. The t should indicate a open circuit in audib e If the atches do not activate the switches when the door is closed, the switches should be a adjusted in accorc ance wit tle adjustment procedure. Disconnect the wire lead from the h pen h the meter should indicate an closed circuit Whcn the secondary switch operation is abnorma , make the necessary adjustment or replace the switch only witn e same type or switcn. primary switch. Connect the ohmmeter eads to the on-(COM)-and-Rormally-open (NO) C. MONITOR SWITCH TEST termina of the switch-The meter should indicate Disconnect the wire ead from the monitor switch. an open circuit in the door open condition. Connect the ohmmeter leads to the common -When-the-door-rs-close-dthe-meter--shoulti-(GO-M)-antl-hormal-ly-e-loseti-(N-G)-le-rm-rnals-o-f-the- indicate a closed circuit. switch. The meter should indicate closed circuit in When the primary switch operation is abnormal, the door open condition When the door is closed, make the necessary adjustment or replace the meter should in ica ean open circuit. When the. COMPONENTS SWITCHES (Wire leads removed) the samceartteypr ereopfas.iwr.initcghthe aoor or the interioc system, it is necessary to do this continuity fore operating th TEST PROCEDURE Check for continuity of the switch with an Ohm-meter RESULTS Door 0 Den Door closed Primary CO Switch Monitor Switch NC ( -1 CO COM Secondary rTh Switch NOTE . After checking for the continuity of switches, make sure that are connected correct y 5-7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35

WARNING
FOR
CONTINUED
PROTECTION
AGAINST
EXCESSIVE
RADIATION
EMISSION,
REPLACE
ONLY
WITH
IDENTICAL
REPLACEMENT
PARTS
TYPE
NO.SZM-V
16
-FA
-63
OR
VP
-533A
-OF
FOR
PRIMARY
SWITCH
TYPE
NO
SZM-V
1G
-FA
-G2
OR
VP
-532A
-OF
FOR
MONITOR
SW
TCH
TYPF
NO
S7M-V
16
-FA
-63
OR
VP
-533A
-OF
FOR
SFCONDARY
SWITCH
Whcn
the
door
release
button
is
dcprcsscd
slowly
with
the
door
c
osed,
an
audib
e
click
should
be
isconnect
me
wire
lean
rrom
me
secon
ary
switch
heard
at
the
same
time
or
successively
at
intervals.
When
the
button
is
released
slowly,
the
(COM)
and
normally
open
(NO)
terminals
of
the
t
h.
The
t
should
indicate
a
open
circuit
in
audib
e
If
the
atches
do
not
activate
the
switches
when
h
pen
h
the
meter
should
indicate
an
closed
circuit
Whcn
the
the
door
is
closed,
the
switches
should
be
a
adjusted
in
accorc
procedure.
Disconnect
the
wire
lead
from
the
primary
switch.
Connect
the
ohmmeter
eads
to
the
on-(COM)-and-Rormally-op
en
(NO)
termina
secondary
switch
operation
is
abnorma
,
make
the
necessary
adjustment
or
replace
the
switch
only
ance
wit
t
le
adjustment
witn
e
same
type
or
switcn.
C.
MONITOR
SWITCH
TEST
of
the
switch
The
meter
should
indicate
Disconnect
the
wire
ead
from
the
monitor
switch.
an
open
circuit
in
the
door
open
condition.
Connect
the
ohmmeter
leads
to
the
common
-When-the-door-rs-close-dthe-meter--shoulti-(GO-M)-antl-hormal-ly-e-loseti-(N-G)-le-rm-rnals-o-f-the-
indicate
a
closed
circuit.
When
the
primary
switch
operation
is
abnormal,
make
the
necessary
adjustment
or
replace
the
meter
should
in
ica
ean
open
circuit.
When
the
.
switch.
The
meter
should
indicate
closed
circuit
in
the
door
open
condition
When
the
door
is
closed,
the
same
type
of
switch
.
.
ca
rter
repairing
the
aoor
or
the
interioc
system,
it
is
necessary
to
do
this
continuity
fore
operating
th
COMPONENTS
TEST
PROCEDURE
RESULTS
SWITCHES
(Wire
leads
removed)
Check
for
continuity
of
the
switch
with
an
Ohm
-meter
Door
0
Door
closed
Primary
Switch
Monitor
Switch
(
-
1
Secondary
Switch
rTh
NOTE
.
After
checking
for
the
continuity
of
switches,
make
sure
that
are
connected
correct
y
5-7