Lantronix SISPM1040-3166-L SISPM1040-3248-L and SISPM1040-3166-L Quick Start G - Page 1

Lantronix SISPM1040-3166-L Manual

Page 1 highlights

SISPM1040-3xxx-L Quick Start Guide SISPM1040-3xxx-L Quick Start Guide The SISPM1040-3248-L is a managed Hardened PoE+ Switch provides (24) 10/100/1000 PoE+ ports, 4 100/1000 dual speeds SFP ports with additional (4) 1G/10G SFP+ slot, it supplies up to 370W PoE budget over 24 PoE+ ports. The SISPM1040-3166-L is a managed Hardened PoE+ Switch provides (16) 10/100/1000 PoE+ ports, 4 100/1000 dual speeds SFP ports with additional (2) 1G/10G SFP+ slot, it supplies up to 250W PoE budget over 16 PoE+ ports. See the SISPM1040-3xxx-L Install Guide for important Safety Warnings & Cautions, Features, Specs, Software features, Front panel, LEDs, Mounting, Connecting, Installing, Power Supply, Initial config, and Troubleshooting information. LED Descriptions: The front panel LEDs display switch status. The three types of LEDs are: System LED: Indicates if the switch is powered up correctly or if there is a system alarm triggered. Power LEDs (P1/P1: DC LED, P3: AC LED): Indicate if the switch is powered up correctly. Port Status LEDs: Indicate the current status of each port. Reset Button: Press to toggle the LEDs to display Link/Activity/Speed or just display PoE port status. By pressing the Reset button for a certain period, you can 1. Reset the switch (reboot and get the switch back to the previously saved configuration settings). 2. Restore the switch to Factory Defaults. See the Install Guide. Back Panel: provides 52-57 VDC and 100-250 VAC power inputs and DI/DO relay. See the Install Guide for DI/DO configuration information. Package Contents : Make sure you have received one Switch with one Power Supply installed, one DB-9 to RJ45 Cable, AC Power cord (Option), four rubber feet, this manual, Rack Mount Brackets, and a secondary Power Supply (Option). 19-inch Rack Mounting: 1. Attach the mounting brackets to both sides of the chassis. Insert screws and tighten with a screwdriver to secure the brackets. 2. Place the switch on a rack shelf in the rack and push it in until the oval holes in the brackets align with the mounting holes in the rack posts. 3. Attach the brackets to the posts; insert screws and tighten. Desk or Shelf Mounting: 1. Verify that the workbench is sturdy and reliably grounded. 2. Attach the four adhesive rubber feet to the bottom of the switch. Installing SFP Modules: You can install or remove a Hardened SFP/SFP+ Module from an SFP port without powering off the switch. Note: The SFP ports should use UL Listed Optional Transceiver product, Rated 3.3Vdc, Laser Class 1. 1. Make sure the SFP is oriented correctly. 2. Insert the module into the SFP port. 3. Press firmly to ensure that the module seats into the connector. ATTENTION: This case must be earth grounded. No DC input may be earth grounded. Use Isolated Power Supply. WARNING: Hot Surface Do Not Touch. Caution: The switch is an indoor device. If it used with outdoor devices such as outdoor IP cameras, you are strongly suggested to install a surge protector or surge suppressor to protect the switch. See the Install Guide. Power Supplies: 25104 Input: 85-264 VAC, 124-370 VDC; Output: 48 ~ 55 VDC, 5A, 240 Watts. 25160 Input 90-264 VAC, 127-370 VDC; Output: 48 ~ 55 VDC, 10A, 480 Watts. PS-DC-DUAL-5624T Power Supply with 56VDC and 24VDC Dual Output. See the Install Guide. Power Connection: Warning: Connect the power supply to the switch first, and then connect the power supply to power. Otherwise catastrophic product failure may occur. 1. Verify that power is off to the DC circuit that you are going to attach to the switch PoE DC-input connector. This can be either of the two power supplies (AC-input or DC-input) or site source DC. 2. As an added precaution, place an appropriate safety flag and lockout device at the source power circuit breaker, or place a piece of adhesive tape over the circuit breaker handle to prevent accidental power restoration while you are working on the circuit. Power Disconnection: To disconnect power from the switch after a successfully boot: 1. Turn off power to the switch. 2. Disconnect the cables. 33761 Rev. D https://www.lantronix.com/ Page 1 of 2

  • 1
  • 2

SISPM1040-3xxx-L Quick Start Guide
33761 Rev. D
Page
1
of
2
SISPM1040-3xxx-L
Quick Start Guide
The
SISPM1040-3248-L
is a managed Hardened PoE+ Switch provides
(24) 10/100/1000 PoE+ ports, 4 100/1000 dual speeds SFP ports with
additional (4) 1G/10G SFP+ slot, it supplies up to 370W PoE budget over
24 PoE+ ports.
The
SISPM1040-3166-L
is a managed Hardened PoE+ Switch provides (16) 10/100/1000 PoE+ ports, 4 100/1000 dual
speeds SFP ports with additional (2) 1G/10G SFP+ slot, it supplies up to 250W PoE budget over 16 PoE+ ports.
See the SISPM1040-3xxx-L Install Guide
for important Safety Warnings & Cautions, Features, Specs, Software features,
Front panel, LEDs, Mounting, Connecting, Installing, Power Supply, Initial config, and Troubleshooting information.
LED Descriptions
:
The front panel LEDs display switch status. The three types of LEDs are:
System
LED: Indicates if the switch is powered up correctly or if there is a system alarm triggered.
Power
LEDs (P1/P1: DC LED, P3: AC LED): Indicate if the switch is powered up correctly.
Port
Status
LEDs: Indicate the current status of each port.
Reset Button
: Press to toggle the LEDs to display Link/Activity/Speed or just display PoE port status. By pressing the
Reset button for a certain period, you can
1. Reset
the switch (reboot and get the switch back to the previously saved
configuration settings).
2. Restore
the switch to Factory Defaults. See the Install Guide.
Back Panel
: provides 52-57 VDC and 100-250 VAC power inputs and DI/DO relay. See the Install Guide for DI/DO
configuration information.
Package Contents
: Make sure you have received one Switch with one Power Supply installed, one DB-9 to RJ45 Cable,
AC Power cord (Option), four rubber feet, this manual, Rack Mount Brackets, and a secondary Power Supply (Option).
19-inch Rack Mounting
:
1.
Attach the mounting brackets to both sides of the chassis. Insert screws and tighten with a
screwdriver to secure the brackets.
2.
Place the switch on a rack shelf in the rack and push it in until the oval holes in the
brackets align with the mounting holes in the rack posts.
3.
Attach the brackets to the posts; insert screws and tighten.
Desk or Shelf Mounting
:
1.
Verify that the workbench is sturdy and reliably grounded.
2.
Attach the four adhesive
rubber feet to the bottom of the switch.
Installing SFP Modules
: You can install or remove a Hardened SFP/SFP+ Module from an SFP port without powering off
the switch.
Note
: The SFP ports should use UL Listed Optional Transceiver product, Rated 3.3Vdc, Laser Class 1.
1.
Make sure the SFP is oriented correctly.
2.
Insert the module into the SFP port.
3.
Press firmly to ensure that the
module seats into the connector.
ATTENTION
:
This case must be earth grounded. No DC input may be earth grounded.
Use Isolated Power Supply.
WARNING
:
Hot Surface Do Not Touch.
Caution
:
The switch is an indoor device. If it used with outdoor devices such as outdoor IP cameras, you are strongly
suggested to install a surge protector or surge suppressor to protect the switch. See the Install Guide.
Power Supplies
:
25104
Input: 85-264 VAC, 124-370 VDC; Output: 48 ~ 55 VDC, 5A, 240 Watts.
25160
Input 90-264 VAC,
127-370 VDC; Output: 48 ~ 55 VDC, 10A, 480 Watts.
PS-DC-DUAL-5624T
Power Supply with 56VDC and 24VDC Dual
Output. See the Install Guide.
Power Connection
:
Warning
:
Connect the power supply to the switch first, and then
connect the power supply to power. Otherwise catastrophic product failure may occur.
1.
Verify that power is off to the
DC circuit that you are going to attach to the switch PoE DC-input connector. This can be either of the two power
supplies (AC-input or DC-input) or site source DC.
2.
As an added precaution, place an appropriate safety flag and
lockout device at the source power circuit breaker, or place a piece of adhesive tape over the circuit breaker handle to
prevent accidental power restoration while you are working on the circuit.
Power Disconnection
: To disconnect power
from the switch after a successfully boot:
1.
Turn off power to the switch.
2.
Disconnect the cables.