Lenovo Storage S3200 (English) Setup Guide - Lenovo Storage S3200, S2200 - Page 21

Installing the enclosures, Installation checklist, FDE considerations

Page 21 highlights

2 Installing the enclosures Installation checklist The following table outlines the steps required to install the enclosures, and initially configure and provision the storage system. To ensure successful installation, perform the tasks in the order presented. Table 3 Installation checklist Step Task Where to find procedure 1. Install the controller enclosure and optional See the rack-mount bracket kit installation instructions drive enclosures in the rack, and attach the enclosure bezel.1 pertaining to your enclosure. Also refer to the bezel attachment instructions for your enclosure 2. Connect controller enclosure and optional drive enclosures. See Connecting the controller enclosure and drive enclosures on page 22. 3. Connect power cords. See Powering on/powering off on page 28. 4. Test enclosure connectivity. See Testing enclosure connections on page 28. 5. Install required host software. See Host system requirements on page 30. 6. Connect hosts.2 See Connecting the enclosure to hosts on page 30. 7. Connect remote management hosts.2 See Connecting a management host on the network, page 40. 8. Obtain IP values and set network port IP properties on the controller enclosure. See Obtaining IP values on page 41. For USB CLI port and cable use, see Appendix D. 9. Use the CLI to set the host interface protocol. See CNC technology on page 30. The CNC models allow you to set the host interface protocol for your qualified SFP option. Use the set host-port-mode command as described in the CLI Reference Guide or online help. 10. Perform initial configuration tasks3: Topics below correspond to bullets at left: • Sign-in to the web-browser interface to access the application GUI. See "Getting Started" in the web-posted Lenovo Storage Manager Guide. • Verify firmware revisions and update if necessary. See Updating firmware. Also see the same topic in the Storage Manager Guide. • Initially configure and provision the system See "Configuring the System" and "Provisioning the System" using the Storage Management Console. topics in the Storage Manager Guide or online help. 1See the Lenovo Storage CRU Installation and Replacement Guide for illustrations and narrative describing attachment of enclosure bezels to 2U24 and 2U12 chassis. See also Enclosure bezel attachment and removal on page 56. 2For more about hosts, see the "About hosts" topic in the Storage Manager Guide. 3The Storage Management Console is introduced in Accessing the SMC on page 45. See the Storage Manager Guide or online help for additional information. NOTE: Additional installation notes: • Controller modules within the same enclosure must be of the same type. • For optimal performance, do not mix 6 Gb and 3 Gb disk drives within the same enclosure. FDE considerations The Full Disk Encryption feature available via the management interfaces requires use of self-encrypting drives (SED) which are also referred to as FDE-capable disk drive modules. When installing FDE-capable disk drive modules, follow the same procedures for installing disks that do not support FDE. The exception occurs when you move FDE-capable disk drive modules for one or more disk groups to a different system, which requires additional steps. Lenovo Storage S3200/S2200 Setup Guide 21

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86

Lenovo Storage S3200/S2200 Setup Guide
21
2
Installing the enclosures
Installation checklist
The following table outlines the steps required to install the enclosures, and initially configure and provision
the storage system. To ensure successful installation, perform the tasks in the order presented.
1
See the
Lenovo Storage CRU Installation and Replacement Guide
for illustrations and narrative describing attachment of enclosure
bezels to 2U24 and 2U12 chassis. See also
Enclosure bezel attachment and removal
on page 56.
2
For more about hosts, see the “About hosts” topic in the Storage Manager Guide.
3
The Storage Management Console is introduced in
Accessing the SMC
on page 45. See the Storage Manager Guide or online
help for additional information.
NOTE:
Additional installation notes:
Controller modules within the same enclosure must be of the same type.
For optimal performance, do not mix 6 Gb and 3 Gb disk drives within the same enclosure.
FDE considerations
The Full Disk Encryption feature available via the management interfaces requires use of self-encrypting
drives (SED) which are also referred to as FDE-capable disk drive modules. When installing FDE-capable
disk drive modules, follow the same procedures for installing disks that do not support FDE. The exception
occurs when you move FDE-capable disk drive modules for one or more disk groups to a different system,
which requires additional steps.
Table 3
Installation checklist
Step
Task
Where to find procedure
1.
Install the controller enclosure and optional
drive enclosures in the rack, and attach the
enclosure bezel.
1
See the rack-mount bracket kit installation instructions
pertaining to your enclosure. Also refer to the bezel
attachment instructions for your enclosure
2.
Connect controller enclosure and optional
drive enclosures.
See
Connecting the controller enclosure and drive enclosures
on page 22.
3.
Connect power cords.
See
Powering on/powering off
on page 28.
4.
Test enclosure connectivity.
See
Testing enclosure connections
on page 28.
5.
Install required host software.
See
Host system requirements
on page 30.
6.
Connect hosts.
2
See
Connecting the enclosure to hosts
on page 30.
7.
Connect remote management hosts.
2
See
Connecting a management host on the network
,
page 40.
8.
Obtain IP values and set network port IP
properties on the controller enclosure.
See
Obtaining IP values
on page 41.
For USB CLI port and cable use, see Appendix D.
9.
Use the CLI to set the host interface protocol.
See
CNC technology
on page 30. The CNC models allow
you to set the host interface protocol for your qualified SFP
option. Use the
set host-port-mode
command as
described in the CLI Reference Guide or online help.
10.
Perform initial configuration tasks
3
:
Sign-in to the web-browser interface to
access the application GUI.
Verify firmware revisions and update if
necessary.
Initially configure and provision the system
using the Storage Management Console.
Topics below correspond to bullets at left:
See “Getting Started” in the web-posted
Lenovo Storage
Manager Guide
.
See
Updating firmware
. Also see the same topic in the
Storage Manager Guide.
See “Configuring the System” and “Provisioning the System”
topics in the Storage Manager Guide or online help.