Lenovo ThinkPad X130e Hardware Maintenance Manual - X130e - Page 67
When installing - case
![]() |
View all Lenovo ThinkPad X130e manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 67 highlights
3 3 3 8 6 7 4 5 When installing: Make sure that the connectors are attached firmly. Step 3 Screw (quantity) M2 × 6 mm, wafer-head, nylok-coated (3) Color Silver Torque 0.181 Nm (1.85 kgfcm) In step 9 , push the top case assembly out from the frame as shown in the following figure by using a plastic pry tool, and remove the top case assembly in the direction shown by the arrow 10 . 9 9 9 9 10 9 9 9 9 When installing: Make sure that all the projections of the top case assembly are attached firmly to the guide holes of the base cover. Chapter 8. Removing and replacing a FRU 61
![](/manual_guide/products/lenovo-thinkpad-x130e-hardware-maintenance-manual-x130e-dbe54c9/67.png)
3
3
3
8
4
5
6
7
When installing:
Make sure that the connectors are attached firmly.
Step
Screw (quantity)
Color
Torque
3
M2 × 6 mm, wafer-head, nylok-coated (3)
Silver
0.181 Nm
(1.85 kgfcm)
In step
9
, push the top case assembly out from the frame as shown in the following figure by using a plastic
pry tool, and remove the top case assembly in the direction shown by the arrow
10
.
9
9
9
10
9
9
9
9
9
When installing:
Make sure that all the projections of the top case assembly are attached firmly to the
guide holes of the base cover.
Chapter 8
.
Removing and replacing a FRU
61