LevelOne GEP-0950 Manual - Page 10
Installation
View all LevelOne GEP-0950 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 10 highlights
2. Installation 2-1. Installing the Switch This section will give users a quick start for: - Hardware and Cable Installation - Management Station Installation - Software booting and configuration 2-1-1. Hardware and Cable Installation At the beginning, please do first: Wear a grounding device to avoid the damage from electrostatic discharge Be sure that power switch is OFF before you insert the power cord to power source • Installing Optional SFP Fiber Transceivers to the Switch Note: If you have no modules, please skip this section. • Connecting the SFP Module to the Chassis: The optional SFP modules are hot swappable, so you can plug or unplug it before or after powering on. 1. Verify that the SFP module is the right model and conforms to the chassis 2. Slide the module along the slot. Also be sure that the module is properly seated against the slot socket/connector 3. Install the media cable for network connection 4