LiftMaster CSL24ULWK Installation Manual - Page 48
SAMS wiring with relays not energized, Dual Gate Settings, Main control board, Expansion board
![]() |
View all LiftMaster CSL24ULWK manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 48 highlights
APPENDIX SAMS wiring with relays not energized Dual Gate Settings NOTE: We recommend that all accessories and board configurations are set on the primary operator. Main control board Accessories FEATURE PRIMARY OPERATOR Timer-to- Set the TTC dial to desired Close setting SECONDARY OPERATOR OFF ACCESSORY Remote Controls Bi-Part Delay Switch Bi-Part Delay: ON (will open last and close first) Tandem Mode: OFF Synchronized Close: ON Bi-Part Delay: OFF (will open first and close last) Tandem Mode: OFF Synchronized Close: ON Expansion board FEATURE PRIMARY OPERATOR SECONDARY OPERATOR LiftMaster Internet Gateway Garage and Gate Monitor QUICK CLOSE Switch ON OFF ANTI-TAIL Switch ON OFF LOW BATT Switch Battery Fail OPEN: OPEN Battery Fail CLOSE: CLOSE Battery Fail OPEN: OPEN Battery Fail CLOSE: CLOSE AC FAIL OPEN/BATT OPEN Switch OPEN PRIMARY OPERATOR SECONDARY OPERATOR Program remote controls 1 to 50 to the primary operator. Program remote controls 51 to 100 to the secondary operator Program to primary operator. Program to primary operator. 48
![](/manual_guide/products/liftmaster-csl24ul-installation-manual-93835eb/48.png)