Lowrance Mark-5x Certificate CCS Multifunction Display - Radar - Page 2

m/Application

Page 2 highlights

18 Feb,2014 2:24 PM IIP ,11 / Product Description ill-fWgiCertificate No. WG13T00004 4tOtt(it MP-R-W-0-#44/ Approved Drawings and Design Calculations RIAWM/ Drawings Approval No. NP13A01129 lATIT-140**/ Approval Test Report iAgAMM4-q-/Test Report No. ift4R*FlAg/Test Report Date 1.40P- Vii/ Laboratory 15kWitiittE/ Test Address Type test reports package 2013-12-01 Navico i WA LTm/Application of the Product This product is not in compliance with IMO/SOLAS performance standards. It is intended for the installation on board the vessels while not enforced to provide by Flag Administration. iATITIV4A-(/ Maintenance Requirements of Approval 1. pJla, A[1*RpAlt1- 04-19,3iffe'Ittit. Wir.; VcAnifignaATfta,k, ElAiiiATITH$631, ArIJ4AIMARSCILMItaktittiOlito 4#4*.40)1M40300i14-, JtMATMEIMM**V0A4-4. After type approval, if there are changes to the design, materials used or manufacturing method of the product and important components and such changes affect major characteristics and properties of the product, or property indexes of the product are changed and exceed the scope of approval, related drawings and documents are to be examined and approved by the concerned survey office. Where deemed necessary by the survey office, the surveyor to the Society will go to witness relevant tests and conduct inspection and the results should be able to demonstrate compliance with the approval conditions. 2. irnMIV4.'14:AaRIME3j-z4Y, A pJ ~ Co tiaiRttgi*AAtaSc5E, gZglitf2MAiiEVIVAV #1151*ffiliVito The quality management system of the factory shall be ensure effective operation, and shall be the same as the situation of approval. If there are any changes to the quality management system, auditing of the original certification organization for quality management system and the society's approval shall be obtained. 3. - .-ijE4MCAJW3, toAtioxixemR*R:fkmvAlona, in P- alitxgoomilnote Within the validity of the approval certificate, if cases occur that may cause the Society to withdraw the approval, the manufacturer should take corrective actions in a prompt and effective manner. 4. WATITIETMagiiO3, ;400AttAYAIVE .WICA3MUMAR-Fnirini'caliMilf11-11-WfA, 10111E7'PrAt T'tAWV,I-ROAKt1- VMMINKTTISC4. ii-r/TIAE*0 Within the validity of the approval certificate, the surveyor to the Society may pay unannounced audit to the manufacturing process of the product in order to confirm whether it is in compliance with the drawings and documents approved by the Society. The factory should provide an active cooperation and necessary for the surveyor. -00:11.kr wrppi*on .A/ Method of Product Inspection after Approval WINIAMItOffftW411/The product inspected by sampling in term of the rules: tOTKiW'RitNagidOWNWIMMOWOLIUMittl*ftliMITV'Aiftiflarlf-AML, gRMIMA3BOM 3J'ART'AiE40 After approval, product inspection should be carried out by sampling by the Surveyor of the Society in accordance with the approved product inspection scheme, and the Product Certificate will be issued by the Society upon satisfactory inspection. Xvf -Tg404-frIVIVIHMAM0*/ Inspection Requirements for Materials and Components Nil MIA'IN/ Statement of Responsibility AqinUTITFIP5g. Oftlg*RtIVOWA9E40.15-)Mat]:FltiATiftr126I, 41PFXIIVAqiIITZIOWOE) `J I, TAktnAVAISIJO4Akik. itDPitkTqTWtMkntkWflgWIVE. The approval of the Society does not affect -and replace any approval and certification of the S mlDP,3 too manufacturer by any parties that bear no relation with this Society's authorization or survey and therefore takes no responsibility economic liabilities arising from for -these accepting parties. The Society does not undertake any legal and this Society's certificate without prior permission from (TS ( SCI'S (1'1 this Society. \ --9 1 1666318 1$ibl*F000'64. 2 4t 3 "fi.fl / Page 2 of 3

  • 1
  • 2
  • 3
  • 4
  • 5

18
Feb,2014
2:24
PM
ill-fWgiCertificate
No.
WG13T00004
IIP
,
11
/
Product
Description
4tOtt(it
MP
-R
-W-0-#44/
Approved
Drawings
and
Design
Calculations
RIAWM/
Drawings
Approval
No.
NP13A01129
lATIT-140**/
Approval
Test
Report
iAgAMM4-q
-
/Test
Report
No.
Type
test
reports
package
ift4R*FlAg/Test
Report
Date
2013-12-01
1.40P-
Vi
i/
Laboratory
Navico
15kWitiittE/
Test
Address
i
WA
LT
m/Application
of
the
Product
This
product
is
not
in
compliance
with
IMO/SOLAS
performance
standards.
It
is
intended
for
the
installation
on
board
the
vessels
while
not
enforced
to
provide
by
Flag
Administration.
iATITIV4A-(/
Maintenance
Requirements
of
Approval
1.
pJla,
A[1*RpAlt
-
104-19,3iffe'Ittit.
Wir.;
VcAnifignaATfta,k,
ElAiiiATITH$631,
Ar
IJ4AIMARSCILMItaktittiOlito
4#4*.40)1M40300i14
-
,
JtMATMEIMM**V0A4-4.
After
type
approval,
if
there
are
changes
to
the
design,
materials
used
or
manufacturing
method
of
the
product
and
important
components
and
such
changes
affect
major
characteristics
and
properties
of
the
product,
or
property
indexes
of
the
product
are
changed
and
exceed
the
scope
of
approval,
related
drawings
and
documents
are
to
be
examined
and
approved
by
the
concerned
survey
office.
Where
deemed
necessary
by
the
survey
office,
the
surveyor
to
the
Society
will
go
to
witness
relevant
tests
and
conduct
inspection
and
the
results
should
be
able
to
demonstrate
compliance
with
the
approval
conditions.
2.
irnMIV4.'14:AaRIME3j-z4Y,
A
pJ
~
Co
tiaiRttgi*AAtaSc5E,
gZglitf2MAiiEVIVAV
#1151*ffiliVito
The
quality
management
system
of
the
factory
shall
be
ensure
effective
operation,
and
shall
be
the
same
as
the
situation
of
approval.
If
there
are
any
changes
to
the
quality
management
system,
auditing
of
the
original
certification
organization
for
quality
management
system
and
the
society's
approval
shall
be
obtained.
3.
-
.-
ijE4MCAJW3,
toAtioxixemR*R:fkmvAlona,
in
-
Palitxgoomilnote
Within
the
validity
of
the
approval
certificate,
if
cases
occur
that
may
cause
the
Society
to
withdraw
the
approval,
the
manufacturer
should
take
corrective
actions
in
a
prompt
and
effective
manner.
4.
WA
TI
TIETMagiiO3,
;400AttAYAIVE
.W
ICA3MUMAR
-
Fnirini'caliMilf11-11
-
WfA,
10111E7'PrAt
T'tAWV,I
-
ROAKt1
-
VMMINKTTISC4.
ii
-
r/TIAE*0
Within
the
validity
of
the
approval
certificate,
the
surveyor
to
the
Society
may
pay
unannounced
audit
to
the
manufacturing
process
of
the
product
in
order
to
confirm
whether
it
is
in
compliance
with
the
drawings
and
documents
approved
by
the
Society.
The
factory
should
provide
an
active
cooperation
and
necessary
for
the
surveyor.
-
00:11
.
kr
wrppi*on
.
A/
Method
of
Product
Inspection
after
Approval
WINIAMItOffftW411/The
product
inspected
by
sampling
in
term
of
the
rules:
tOTKiW'RitNagidOWNWIMMOWOLIUMittl*ftliMITV'Aiftiflarlf
-
AML,
gRMIMA3BOM
3J'ART'AiE40
After
approval,
product
inspection
should
be
carried
out
by
sampling
by
the
Surveyor
of
the
Society
in
accordance
with
the
approved
product
inspection
scheme,
and
the
Product
Certificate
will
be
issued
by
the
Society
upon
satisfactory
inspection.
Xvf
-
Tg404-frIVIV
I
HMAM0*/
Inspection
Requirements
for
Materials
and
Components
Nil
MIA'IN/
Statement
of
Responsibility
AqinUTITFIP5g.
Oftlg*RtIVOWA9E40.15-)Mat]:FltiATiftr126I,
41PFXIIVAqiIITZIOWOE)
`J
I,
TAktnAVAISIJO4Akik.
itDPitkTqTWtMkntkWflgWIVE.
The
approval
of
the
Society
does
not
affect
-and
replace
any
approval
and
certification
of
the
manufacturer
by
any
parties
that
bear
no
relation
with
this
Society's
authorization
or
survey
and
therefore
takes
no
responsibility
for
-these
parties.
The
Society
does
not
undertake
any
legal
and
economic
liabilities
arising
from
accepting
this
Society's
certificate
without
prior
permission
from
this
Society.
S
mlDP,3
too
(TS
(
SCI'S
(1'1
\
--
9
1
1666318
1$ibl*F000'64
.
2
4t
3
"ff
il
.
/
Page
2
of
3