Maytag MBL1956KES Use and Care Guide - Page 10
Connecting the Water Supply - repair
UPC - 719881174082
View all Maytag MBL1956KES manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 10 highlights
Installation Connecting the Water Supply (select models) WARNING To reduce the risk of injury or death, follow basic precautions, including the following: • Read all instructions before installing ice maker. • Do not attempt installation if instructions are not understood or if they are beyond personal skill level. • Observe all local codes and ordinances. • Do not service ice maker unless specifically recommended in Use & Care Guide or published user-repair instructions. • Disconnect power to refrigerator before installing ice maker. • Water damage due to an improper water connection may cause mold/mildew growth. Clean up spills or leakage immediately. CAUTION To avoid property damage or possible injury, follow basic precautions, including the following: • Consult a plumber to connect 1⁄4" O.D. copper tubing to household plumbing to assure compliance with local codes and ordinances. • Confirm water pressure to water valve is between 35 and 100 pounds per square inch. 20 pounds per square inch if there is not a water filter. • Do not use a self-piercing, or 3⁄16" saddle valve. Both reduce water flow and can become clogged over time, and may cause leaks if repair is attempted. • Tighten nuts by hand to prevent cross threading. Finish tightening nuts with pliers and wrenches. Do not over-tighten. • Wait 2-3 hours before placing refrigerator into final position to check and correct any water leaks. Recheck for leaks after 24 hours. • Verify the copper tubing under the sleeve is smooth and free from defects. Do not reuse an old sleeve. Materials Needed: • 1⁄4" outer diameter flexible copper tubing • Shut-off valve (requires a 1⁄4" hole to be drilled into water supply line before valve attachment) • Adjustable wrench (2) • 1⁄4" hex nut driver Notes: • Use copper tubing only for installation. Plastic is less durable and can cause damage. • Add 8' to tubing length needed to reach water supply for creation of service loop. 1. Create service loop with copper tubing (minimum 2' diameter). Avoid kinks in the copper tubing when bending the service loop. Do not use plastic tubing. 2' diameter minimum 2. Remove plastic cap from water valve inlet port. 3. Place brass nut (A) and sleeve (B) on copper tube end as illustrated. Reminder: Do not use an old sleeve. The nut and sleeve are B provided in the Use and Care A packet. 4. Place end of copper tubing into water valve inlet port. Shape tubing slightly. Do not kink - so B that tubing feeds straight into inlet A port. 9