Maytag MDB8959SAS Installation Guide - Page 10
Option A, Waste disposer - no air gap, Option B, No waste disposer - no air gap - installation
View all Maytag MDB8959SAS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 10 highlights
Option B, No waste disposer - no air gap IMPORTANT: The drain hose connection of the disposer or a waste tee must be made before the drain trap and at least 20" (50.8 cm) above the floor where the dishwasher will be installed. Helpful Tip: To reduce vibration of the hose, keep the hose away from the floor. Option A, Waste disposer - no air gap 1. Using a hammer and screwdriver, knock plug into disposer. 2. Use needle-nose pliers to remove plug. 3. Attach drain hose to disposer inlet with large blue drain hose clamp (provided). Use pliers to squeeze clamp open and move into position. 1. Fit rubber end of drain hose to waste tee and cut if needed. NOTE: Do not cut ribbed section. 2. Attach rubber end of drain hose to waste tee with a large blue drain hose clamp (provided). Use pliers to squeeze clamp open and move into position. If the drain hose was cut, use a 1¹⁄₂" to 2" (3.8 to 5 cm) screwtype clamp (not provided). 10