Maytag MDE2400AYW Installation Instructions - Page 12

Additional Instructions For Export Models - fuse

Page 12 highlights

ADDITIONAL INSTRUCTIONS FOR EXPORT MODELS (Not U.S. or Canada) Contact the distributor that sold the appliance or: Maytag International, 8700 W. Bryn Mawr Avenue, Chicago, Illinois USA 60631, 773-714-0100, for information on product, shipping damage, replacement parts and accessories. Maytag dryer models manufactured for operation on 60 Hz AC are not designed for use on 50 Hz AC electrical service and conversion of the product from 60 to 50 Hz operation is not recommended. For additional information on 50 Hz products, contact Maytag International. The electric service requirements can be found on the data label located on the front of the dryer behind the door. EXPORT ELECTRIC MODELS Export electric models are manufactured for operation on either 230/240 volt, 50 Hz or 220 volt, 60 Hz approved electric service. A two-wire approved electrical service with a 30ampere fuse or circuit breaker is required. The dryer must be properly grounded with a ground wire. IMPORTANT: When permitted by local codes, the dryer electrical supply may be connected by means of a new power supply cord kit, marked for use with clothes dryers, that is agency listed, rated at 240 volts minimum, 30 amperes with two No. 10 copper wire conductors terminated with closed loop terminals, open-end spade lugs with turned up ends or with tinned leads. Do not reuse a power supply cord from an old dryer. The power cord or electric supply wiring must be retained at the dryer cabinet with a suitable agency listed strain relief. 2-WIRE AND GROUND SYSTEM CONNECTIONS Remove the terminal block cover plate. Insert the power cord with an agency listed strain relief through the hole 2-Wire and Ground System provided in the cabinet near the terminal block. Note, a strain relief must be used. Do not loosen the nuts already installed on the terminal block. Be sure they are tight. Use a 3/8" (1 cm) deep well socket. Secure the power cord ground wire to the terminal block support Neutral Post Power Cord Ground Wire using the ground screw. If the power cord has ring terminals: 1. Place the terminals over the existing nuts on the posts. The neutral wire in power cord must be connected to the center (silver colored) post of the Neutral Power cord and strain relief terminal block. 2. Secure in place using the nuts provided in the parts package. 3. Replace the terminal block cover. If the power cord does not have ring terminals: 1. Use the cupped washers ahead of the nuts. Be sure the terminal block nuts are tight. 2. Secure the power cord in position. 3. Tighten the strain relief screw(s) in order to clamp the strain relief to the cord. 4. Replace the terminal block cover. BEFORE OPERATING OR TESTING, be sure the machine is properly grounded. 12

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12

12
ADDITIONAL INSTRUCTIONS FOR EXPORT MODELS
(Not U.S. or Canada)
Contact the distributor that sold the appliance or: Maytag
International, 8700 W. Bryn Mawr Avenue, Chicago, Illinois USA 60631, 773-714-0100, for
information on product, shipping damage, replacement parts and accessories.
Maytag dryer models manufactured for operation on 60 Hz AC are not designed for use on
50 Hz AC electrical service and conversion of the product from 60 to 50 Hz operation is not
recommended. For additional information on 50 Hz products, contact Maytag International.
The electric service requirements can be found on the data label located on the front of the
dryer behind the door
.
EXPORT ELECTRIC MODELS
Export electric models are manufactured for operation on either 230/240 volt, 50 Hz or 220
volt, 60 Hz approved electric service. A two-wire approved electrical service with a 30-
ampere fuse or circuit breaker is required. The dryer must be properly grounded with a
ground wire.
IMPORTANT:
When permitted by local codes, the dryer electrical supply may be connected
by means of a new power supply cord kit, marked for use with clothes dryers, that is agency
listed, rated at 240 volts minimum, 30 amperes with two No. 10 copper wire conductors
terminated with closed loop terminals, open-end spade lugs with turned up ends or with
tinned leads. Do not reuse a power supply cord from an old dryer. The power cord or electric
supply wiring must be retained at the dryer cabinet with a suitable agency listed strain relief.
2-WIRE AND GROUND SYSTEM CONNECTIONS
Remove the terminal block cover plate.
Insert the power cord
with an agency listed strain relief through the hole
provided in the cabinet near the terminal block.
Note, a
strain relief must be used.
Do not loosen the nuts
already installed on the terminal block. Be sure they are
tight. Use a 3/8
(1 cm) deep well socket. Secure the
power cord ground wire to the terminal block support
using the ground screw.
If the power cord has ring terminals:
1.
Place the terminals over the existing nuts on the
posts. The neutral wire in power cord must be
connected to the center (silver colored) post of the
terminal block.
2.
Secure in place using the nuts provided in the parts package.
3.
Replace the terminal block cover.
If the power cord does not have ring terminals:
1.
Use the cupped washers ahead of the nuts. Be sure the terminal block nuts are tight.
2.
Secure the power cord in position.
3.
Tighten the strain relief screw(s) in order to clamp the strain relief to the cord.
4.
Replace the terminal block cover.
BEFORE OPERATING OR TESTING
, be sure the machine is properly grounded.
2-Wire and Ground System
Neutral
Post
Neutral
Power
Cord
Ground
Wire
Power
cord
and
strain
relief