Maytag MED5630HC Installation Instructions - Page 4

Installation Requirements - model

Page 4 highlights

INSTALLATION REQUIREMENTS Tools and Parts Gather the required tools and parts before starting installation. Tools needed for all installations: Tools needed for gas installations: Flat-blade screwdriver #2 Phillips screwdriver 8" (203 mm) or 10" (254 mm) pipe wrench 8" (203 mm) or 10" (254 mm) adjustable wrench (for gas connections) 1/4" (6 mm) and 5/16" (8 mm) nut driver (recommended) Level Pipe-joint compound resistant to propane gas Parts supplied (all models): Tape measure Pliers Utility knife Tin snips (new vent installations) Leveling legs (4) Parts needed (steam models): "Y" connector 2' (0.6 m) inlet hose Caulking gun and compound (new vent installations) Adjustable wrench that opens to 1" (25 mm) or hex-head socket wrench Wire stripper (direct wire installations) 4 Rubber washer 5' (1.52 m) inlet hose Parts package is located in dryer drum. Check that all parts are included. NOTE: Do not use leveling legs supplied with dryer if installing with a pedestal or a stack kit. Parts needed (not supplied with dryer): ■■ Vent clamps ■■ Vent elbows and vent work

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52

4
INSTALLATION REQUIREMENTS
Tools and Parts
Gather the required tools and parts before starting installation.
Tools needed for all installations:
Level
Tape measure
Flat-blade screwdriver
Adjustable wrench that
opens to 1" (25 mm) or
hex-head socket wrench
Tin snips (new vent
installations)
Caulking gun and
compound (new vent
installations)
1/4" (6 mm) and
5/16" (8 mm) nut driver
(recommended)
Utility knife
Wire stripper
(direct wire installations)
Leveling legs (4)
Tools needed for gas installations:
8" (203 mm) or 10"
(254 mm) pipe wrench
8" (203 mm) or 10" (254 mm)
adjustable wrench (for gas
connections)
Pipe-joint compound
resistant to propane gas
“Y” connector
Parts package is located in dryer drum. Check that all parts are
included.
NOTE:
Do not use leveling legs supplied with dryer if installing
with a pedestal or a stack kit.
Parts supplied (all models):
Parts needed (steam models):
2' (0.6 m) inlet hose
5' (1.52 m) inlet hose
Parts needed (not supplied with dryer):
Vent clamps
Vent elbows and vent work
Rubber washer
#2 Phillips screwdriver
Pliers