Maytag MFI2269FRZ Use & Care Guide - Page 5

Connect to Water Line, IMPORTANT, Connect to Refrigerator, Complete the Installation

Page 5 highlights

Connect to Water Line 1. Unplug refrigerator or disconnect power. 2. Turn OFF main water supply. Turn ON nearest faucet long enough to clear line of water. 3. Find a ¹⁄₂" to 1¹⁄₄" (12.7 mm to 31.8 mm) vertical cold water pipe near the refrigerator. IMPORTANT: ■ Make sure it is a cold water pipe. ■ Horizontal pipe will work, but the following procedure must be followed: Drill on the top side of the pipe, not the bottom. This will help keep water away from the drill. This also keeps normal sediment from collecting in the valve. 4. Determine the length of copper tubing you need. Measure from the connection on the rear of the refrigerator to the water pipe. Add 7 ft (2.1 m) to allow for cleaning. Use ¹⁄₄" (6.35 mm) O.D. (outside diameter) copper tubing. Be sure both ends of copper tubing are cut square. 5. Using a cordless drill, drill a ¹⁄₄" hole in the cold water pipe you have selected. A B C D E F G A. Cold water pipe B. Pipe clamp C. Copper tubing D. Compression nut E. Compression sleeve F. Shutoff valve G. Packing nut 6. Fasten the shutoff valve to the cold water pipe with the pipe clamp. Be sure the outlet end is solidly in the ¹⁄₄" drilled hole in the water pipe and that the washer is under the pipe clamp. Tighten the packing nut. Tighten the pipe clamp screws slowly and evenly so the washer makes a watertight seal. Do not overtighten. 7. Slip the compression sleeve and compression nut on the copper tubing as shown. Insert the end of the tubing into the outlet end squarely as far as it will go. Screw compression nut onto outlet end with adjustable wrench. Do not overtighten or you may crush the copper tubing. 8. Place the free end of the tubing in a container or sink, and turn ON the main water supply. Flush the tubing until water is clear. Turn OFF the shutoff valve on the water pipe. Connect to Refrigerator 1. Create a service loop (minimum diameter of 2 ft [61 cm]) with the copper tubing. Avoid kinks when coiling the copper tubing. 2. Remove the plastic cap from water valve inlet port. Place a compression nut and sleeve on the copper tubing. 3. Insert the end of the copper tubing into the water valve inlet port. Shape tubing slightly so that the tubing feeds straight into the port to avoid kinks. 4. Slide the compression nut over the sleeve and screw into the water valve inlet port. A B C D A. Plastic water tubing C. Compression nut B. Sleeve D. Copper tubing 5. Using an adjustable wrench, hold the nut on the plastic water line to keep it from moving. Then, with a second wrench turn the compression nut on the copper tubing counterclockwise to completely tighten. Do not overtighten. A B C D A. "P" clamp B. Plastic water line C. Compression nut D. Copper tubing 6. Check connection by pulling on copper tubing. Attach copper tubing to refrigerator cabinet with a "P" clamp. Turn on water supply to refrigerator and check for leaks. Correct any leaks. Complete the Installation WARNING Electrical Shock Hazard Plug into a grounded 3 prong outlet. Do not remove ground prong. Do not use an adapter. Do not use an extension cord. Failure to follow these instructions can result in death, fire, or electrical shock. 1. Plug into a grounded 3 prong outlet. NOTE: Allow 24 hours to produce the first batch of ice. Discard the first three batches of ice produced. Allow 3 days to completely fill the ice container. 5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58

5
Connect to Water Line
1.
Unplug refrigerator or disconnect power.
2.
Turn OFF main water supply. Turn ON nearest faucet long
enough to clear line of water.
3.
Find a
¹⁄₂
" to 1
¹⁄₄
" (12.7 mm to 31.8 mm) vertical cold water
pipe near the refrigerator.
IMPORTANT:
Make sure it is a cold water pipe.
Horizontal pipe will work, but the following procedure
must be followed: Drill on the top side of the pipe, not the
bottom. This will help keep water away from the drill. This
also keeps normal sediment from collecting in the valve.
4.
Determine the length of copper tubing you need. Measure
from the connection on the rear of the refrigerator to the water
pipe. Add 7 ft (2.1 m) to allow for cleaning. Use
¹⁄₄
" (6.35 mm)
O.D. (outside diameter) copper tubing. Be sure both ends of
copper tubing are cut square.
5.
Using a cordless drill, drill a
¹⁄₄
" hole in the cold water pipe you
have selected.
6.
Fasten the shutoff valve to the cold water pipe with the pipe
clamp. Be sure the outlet end is solidly in the
¹⁄₄
" drilled hole in
the water pipe and that the washer is under the pipe clamp.
Tighten the packing nut. Tighten the pipe clamp screws slowly
and evenly so the washer makes a watertight seal. Do not
overtighten.
7.
Slip the compression sleeve and compression nut on the
copper tubing as shown. Insert the end of the tubing into the
outlet end squarely as far as it will go. Screw compression nut
onto outlet end with adjustable wrench. Do not overtighten or
you may crush the copper tubing.
8.
Place the free end of the tubing in a container or sink, and turn
ON the main water supply. Flush the tubing until water is clear.
Turn OFF the shutoff valve on the water pipe.
Connect to Refrigerator
1.
Create a service loop (minimum diameter of 2 ft [61 cm]) with
the copper tubing. Avoid kinks when coiling the copper
tubing.
2.
Remove the plastic cap from water valve inlet port. Place a
compression nut and sleeve on the copper tubing.
3.
Insert the end of the copper tubing into the water valve inlet
port. Shape tubing slightly so that the tubing feeds straight
into the port to avoid kinks.
4.
Slide the compression nut over the sleeve and screw into the
water valve inlet port.
5.
Using an adjustable wrench, hold the nut on the plastic water
line to keep it from moving. Then, with a second wrench turn
the compression nut on the copper tubing counterclockwise
to completely tighten. Do not overtighten.
6.
Check connection by pulling on copper tubing. Attach copper
tubing to refrigerator cabinet with a “P” clamp. Turn on water
supply to refrigerator and check for leaks. Correct any leaks.
Complete the Installation
1.
Plug into a grounded 3 prong outlet.
NOTE:
Allow 24 hours to produce the first batch of ice. Discard
the first three batches of ice produced. Allow 3 days to completely
fill the ice container.
A. Cold water pipe
B. Pipe clamp
C. Copper tubing
D. Compression nut
E. Compression sleeve
F. Shutoff valve
G. Packing nut
F
G
A
B
C
D
E
A. Plastic water tubing
B. Sleeve
C. Compression nut
D. Copper tubing
A. “P” clamp
B. Plastic water line
C. Compression nut
D. Copper tubing
B
A
C
D
B
C
D
A
Electrical Shock Hazard
Plug into a grounded 3 prong outlet.
Do not remove ground prong.
Do not use an adapter.
Do not use an extension cord.
Failure to follow these instructions can result in death,
fire, or electrical shock.
WARNING