Netgear GS748T GS748Tv3 Hardware manual - Page 23
Installation, Step 1: Preparing the Site - rack mount kit
UPC - 606449036961
View all Netgear GS748T manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 23 highlights
Chapter 4 Installation This chapter describes the installation procedures for your NETGEAR GS748T Gigabit Smart Switch. Switch installation involves the following steps: 1. Preparing the site 2. Installing the switch 3. Checking the installation 4. Connecting devices to the switch 5. Installing an SFP GBIC module 6. Applying AC power 7. Switching management through a Web Browser or Utility Program (initial configuration) Step 1: Preparing the Site Before you install your switch, ensure that your operating environment meets the environmental requirements in Table 4-1. Table 4-1. Site Requirements Characteristics Mounting Installations Access Power source Requirements Desktop: provide a flat table or shelf surface Rack-mount: use a 19-inch (48.3-centimeter) EIA standard equipment rack that is grounded and physically secure. You also need the rack-mount kit supplied with your switch. Locate the switch in a position that lets you access the front panel RJ-45 ports, view the front panel LEDs, and access power connector. Provide a power sourcea within 6 feet (1.8 meters) of the installation location. Ensure that the AC outlet is not controlled by a wall switch, which can accidentally turn off power to the outlet and the switch. 4-1 v1.1, September 2007