Netgear GS748Tv3 GS748Tv3 Hardware manual - Page 27

Step 6: Applying AC Power

Page 27 highlights

GS748T Smart Switch Hardware Installation Guide Figure 4-3 Step 6: Applying AC Power Because he NETGEAR GS748T Gigabit Smart Switch has no ON/OFF switch, AC power must be controlled by means of the IEC power cord connection. Select an appropriate unswitched, grounded AC facility outlet so as to avoid any future inadvertent power interruptions. Use the following procedure to apply AC power: 1. Connect the female end of the supplied IEC AC power adapter cable to the power receptacle on the back of the switch. 2. Connect the 3-pronged end of the AC power adapter cable to the AC outlet. When you apply power, the green Power LED on the switch front panel illuminates. . Note: If the Power LED does not light, check that the power cable is installed correctly and that the AC power supply is present. If this does not resolve the problem, refer to Appendix A, "Troubleshooting". Step 7: Management through a Web Browser or Utility Program (Initial Configuration) Your NETGEAR GS748T Gigabit Smart Switch has embedded management software for viewing, changing, and monitoring its activity and configuration. You need not use this management software for it to function as a simple switch. However, the management software enables you to Installation 4-5 v1.1, September 2007

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36

GS748T Smart Switch Hardware Installation Guide
Installation
4-5
v1.1, September 2007
Figure 4-3
Step 6: Applying AC Power
Because he NETGEAR GS748T Gigabit Smart Switch has no ON/OFF switch, AC power must be
controlled by means of the IEC power cord connection. Select an appropriate unswitched,
grounded AC facility outlet so as to avoid any future inadvertent power interruptions. Use the
following procedure to apply AC power:
1.
Connect the female end of the supplied IEC AC power adapter cable to the power receptacle
on the back of the switch.
2.
Connect the 3-pronged end of the AC power adapter cable to the AC outlet.
When you apply power, the green Power LED on the switch front panel illuminates.
.
Step 7: Management through a Web Browser or Utility
Program (Initial Configuration)
Your NETGEAR GS748T Gigabit Smart Switch has embedded management software for viewing,
changing, and monitoring its activity and configuration. You need not use this management
software for it to function as a simple switch. However, the management software enables you to
Note:
If the Power LED does not light, check that the power cable is installed correctly
and that the AC power supply is present. If this does not resolve the problem, refer
to
Appendix A, “Troubleshooting”
.