Netgear GS748Tv5 Hardware Installation Guide - Page 24

Step 3: Check the Installation

Page 24 highlights

GS716T, GS724T and GS748T Gigabit Smart Switch Step 3: Check the Installation Before applying power perform the following: • Inspect the equipment thoroughly. • Verify that all cables are installed correctly. • Check cable routing to make sure cables are not damaged or creating a safety hazard. • Ensure all equipment is mounted properly and securely. 20

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42

20
GS716T, GS724T and GS748T Gigabit Smart Switch
Step 3: Check the Installation
Before applying power perform the following:
Inspect the equipment thoroughly.
Verify that all cables are installed correctly.
Check cable routing to make sure cables are not damaged or creating a safety hazard.
Ensure all equipment is mounted properly and securely.