Netgear GSM7212F GSM5212P/GSM7212P/GSM7212F/GSM7224P Hardware Installation Gui - Page 11
Hardware Installation, Package Contents, Protecting Against Electrostatic Discharge
View all Netgear GSM7212F manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 11 highlights
2. Hardware Installation 2 This chapter explains how to install the hardware for the managed switches. Package Contents Each switch is packed and shipped separately. The package contains the following items: • Managed Stackable Switch with preinstalled software • Power cord • Rubber footpads for tabletop installation • Rubber caps for the SFP sockets • Rack-mounting kit • USB console cable with one Mini B connector and one type A connector • Resource CD: The CD either includes these documents or links to access them: - ProSafe Managed Switch CLI Manual, Version 9.0.2 - NETGEAR Managed Switch Administration Guide - NETGEAR Managed Switch Installation Guide - This Hardware Installation Guide • ProSafe NMS200 Network Management System 30-day trial DVD Protecting Against Electrostatic Discharge WARNING! Static electricity can harm delicate components inside your system. To prevent static damage, discharge static electricity from your body before you touch any of the electronic components, such as the microprocessor. You can do so by periodically touching an unpainted metal surface on the switch. You can also take the following steps to prevent damage from electrostatic discharge (ESD): 11