NordicTrack T9.1 Treadmill English Manual - Page 8

Patch Bolts yet.

Page 8 highlights

3. Identify the Right Upright (83), which is marked with a "Right" sticker. Have a second person hold the Right Upright near the Base (90). See the inset drawing. Tie the wire tie in the Right Upright (83) securely around the end of the Wire Harness (84). Then, pull the other end of the wire tie until the Wire Harness is routed completely through the Right Upright. 3 84 Wire Tie 83 84 90 83 Wire 84 Tie 4. Attach the Right Upright (83) to the Base (90) with a 3/8" x 3 1/2" Patch Bolt (8), a 3/8" x 1 1/2" 4 Patch Bolt (6), and two 3/8" Star Washers (12) 83 in the indicated locations. Be careful not to pinch the Wire Harness (84). Partially tighten the Patch Bolts until the heads of the Patch Bolts touch the Base; do not fully tighten the Patch Bolts yet. 84 12 8 6 90 5. With the help of a second person, carefully tip the treadmill onto its right side. Partially fold the 5 Frame (51) so the treadmill is more stable; do not fully fold the Frame yet. Attach two Wheels (91) to the Base (90) with a 3/8" x 2 3/4" Bolt (9) and a 3/8" Nut (13). Do not overtighten the Nut; the Wheels must turn freely. 51 9 90 91 13 8

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

8
5.
With the help of a second person, carefully tip
the treadmill onto its right side. Partially fold the
Frame (51) so the treadmill is more stable;
do
not fully fold the Frame yet.
Attach two Wheels (91) to the Base (90) with a
3/8" x 2 3/4" Bolt (9) and a 3/8" Nut (13).
Do not
overtighten the Nut; the Wheels must turn
freely.
5
91
51
9
90
13
4.
Attach the Right Upright (83) to the Base (90)
with a 3/8" x 3 1/2" Patch Bolt (8), a 3/8" x 1 1/2"
Patch Bolt (6), and two 3/8" Star Washers (12)
in the indicated locations.
Be careful not to
pinch the Wire Harness (84).
Partially tighten
the Patch Bolts until the heads of the Patch
Bolts touch the Base;
do not fully tighten the
Patch Bolts yet.
83
84
8
12
4
90
3.
Identify the Right Upright (83), which is marked
with a “Right” sticker. Have a second person
hold the Right Upright near the Base (90).
See the inset drawing.
Tie the wire tie in the
Right Upright (83) securely around the end of
the Wire Harness (84). Then, pull the other end
of the wire tie until the Wire Harness is routed
completely through the Right Upright.
90
Wire Tie
84
83
84
3
Wire
Tie
83
84
6