Optoma HD65 User's Manual - Page 2

Installing The Ceiling Mount, Installing The Projector Mount, Final Assembly And Adjustment - parts

Page 2 highlights

X INSTALLING THE CEILING MOUNT 1. Select an appropriate projector mounting location and extension shafts (Part No. 9, 10, 11) needed, if any, to get the required projector position. Place the Heavy Duty Ceiling Mount Assembly (Part No. 3) in the desired location, using the mount as a template; mark the two slots onto the mounting surface. 2. Refer to the TOGGLER® brochure "Anchoring Solutions," (Part No. 8). Then follow the instructions that are appropriate for the type of surface on which you will be attaching the Heavy Duty Ceiling Mount Assembly. Note: if you are using the Alligator® anchors, they must be installed in the center of the ceiling joist or beam. Installation along the edge of the joist can cause splitting. 3. Drill the appropriate sized hole at each marked location and insert the previously selected anchor (Part No. 5 or 6) into place. 4. Place the Ceiling Mount Assembly onto the anchors and insert two 2-inch wood screws (Part No. 7). Tighten until snug. Do not over tighten. Y INSTALLING THE PROJECTOR MOUNT 1. Place the PROJECTOR upside down on a flat surface. Being careful not to damage the projector. 2. Place the Heavy Duty Projector Mount Assembly (Part No. 1) onto the projector, lining up the three mounting holes. Using three of the Phillips Projector Mount Screws (Part No. 2), secure the mount to the projector. Z FINAL ASSEMBLY AND ADJUSTMENT 1. Attach the required extension shafts, if any, using a 1/4" star washer (Part No. 12), between each joint. 2. On the Heavy Duty Ceiling Mount Assembly (Part No. 3) loosen the hexagon shaft and ball joint, using the hex wrench (Part No. 13) to unscrew the locking screw in the ball joint. 3. Raise the projector and mount assembly into position under the ceiling mount. Screw the two assemblies together by twisting the hexagon shaft, from step 2 above. Make sure you placed a star washer in this joint also. 4. Using two wrenches, tighten the two hexagon shafts and extension shafts, if any, compressing the star washers. 5. On the Heavy Duty Projector Mount Assembly (Part No. 1) loosen the ball joint by unscrewing the locking screw. 6. Now position the projector and tighten the two ball joints firmly into place using the hex wrench. APPENDIX: PARTS LIST # Description Qty. 1 Projector Mount Assembly 1 2 Projector Mount Screws 4 3 Ceiling Mount Assembly 1 4 TOGGLER® TC® anchor (not shown) 3 5 TOGGLER® AF6 Alligator® anchor 3 (not shown) 6 TOGGLER® Red Key (not shown) 1 7 #10 x 2" Truss Head Phillips Screws 3 8 "Anchoring Solutions" brochure (not shown) 1 9 24" safety cable 1 10 6" Extension Shaft (not shown) 1 11 9" Extension Shaft (not shown) 1 12 1/4" Star Washers 4 13 Hex Wrench 1 T.M. 715 Sycamore Drive Milpitas, CA 95035

  • 1
  • 2

INSTALLING THE CEILING MOUNT
1.
Select an appropriate projector mounting location
and extension shafts (Part No. 9, 10, 11) needed, if
any, to get the required projector position. Place
the Heavy Duty Ceiling Mount Assembly (Part No.
3) in the desired location, using the mount as a
template; mark the two slots onto the mounting
surface.
2.
Refer to the TOGGLER® brochure “Anchoring
Solutions,” (Part No. 8). Then follow the instructions
that are appropriate for the type of surface on
which you will be attaching the Heavy Duty Ceiling
Mount Assembly.
Note: if you are using the
Alligator® anchors, they must be installed in
the center of the ceiling joist or beam.
Installation along the edge of the joist can
cause splitting.
3.
Drill the appropriate sized hole at each marked
location and insert the previously selected anchor
(Part No. 5 or 6) into place.
4.
Place the Ceiling Mount Assembly onto the
anchors and insert two 2-inch wood screws (Part
No. 7). Tighten until snug.
Do not over tighten.
INSTALLING THE PROJECTOR MOUNT
1.
Place the PROJECTOR upside down on a flat
surface. Being careful not to damage the projector.
2.
Place the Heavy Duty Projector Mount Assembly
(Part No. 1) onto the projector, lining up the three
mounting holes. Using three of the Phillips
Projector Mount Screws (Part No. 2), secure the
mount to the projector.
FINAL ASSEMBLY AND ADJUSTMENT
1.
Attach the required extension shafts, if any, using a
1/4” star washer (Part No. 12), between each joint.
2.
On the Heavy Duty Ceiling Mount Assembly (Part
No. 3) loosen the hexagon shaft and ball joint,
using the hex wrench (Part No. 13) to unscrew the
locking screw in the ball joint.
3.
Raise the projector and mount assembly into
position under the ceiling mount. Screw the two
assemblies together by twisting the hexagon shaft,
from step 2 above. Make sure you placed a star
washer in this joint also.
4.
Using two wrenches, tighten the two hexagon
shafts and extension shafts, if any, compressing
the star washers.
5.
On the Heavy Duty Projector Mount Assembly (Part
No. 1) loosen the ball joint by unscrewing the
locking screw.
6.
Now position the projector and tighten the two ball
joints firmly into place using the hex wrench.
APPENDIX: PARTS LIST
#
Description
Qty.
1
Projector Mount Assembly
1
2
Projector Mount Screws
4
3
Ceiling Mount Assembly
1
4
TOGGLER® TC® anchor (not shown)
3
5
TOGGLER® AF6 Alligator® anchor
(not shown)
3
6
TOGGLER® Red Key (not shown)
1
7
#10 x 2” Truss Head Phillips Screws
3
8
“Anchoring Solutions” brochure (not shown)
1
9
24” safety cable
1
10
6” Extension Shaft (not shown)
1
11
9” Extension Shaft (not shown)
1
12
1/4” Star Washers
4
13
Hex Wrench
1
T.M.
715 Sycamore Drive Milpitas, CA 95035