Panasonic FV-07VFH3 FV-07VFH3 Owner's Manual (English) - Page 8
Installation, Joist Mounting, Continued, Between
View all Panasonic FV-07VFH3 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 8 highlights
INSTALLATIONⅠ(BETWEEN JOIST MOUNTING-Ⅰ) CONTINUED ③ Refer to wiring diagram (Page.6) or Fig.9, follow all the local electrical safety codes. As well as the National Electrical code (NEC),Using UL approved wire nuts, connect house power wires and control lead wires to product wires.(Fig.7) Make sure all connections are fastened firmly after wiring is finished. ④ For future inspection by qualified persons, put the lead wires into the hook after connection work.(Fig.8) ⑤ Fix the cord cover with the screws that taken off at step1. WARNING 1. Disconnect power source before working on unit. 2. When making wiring connections take care to prevent excessive slack in the wiring since a layge of current is drawn through the heater electrical wire. 3. To reduce the risk of fire, do not store or use gasoline or other flammable vapors and liquids in the vicinity of the heater CAUTION 1.High temperature, risk of fire, keep electrical cords, drapery,furnishings, and other combustibles at least 3 feet (0.9 m) from the front of the heater and away from the side and rear. 2.Mount the cord cover carefully so that lead wires are not pinched. Red to Blue to wall switch wall switch Brown to wall switch Wire nut Wire nut Hook Green to earth ground White to neutral Black to live Fig.7 Control lead wines Power wires Green wire From red wire From blue wire From brown wire Fig.8 ON/OFF HEAT/VENT (wall switch) Green White N L Black E Fig.9 6. Main body fixed. Push the main body upward into the ceiling, use 4 of the ST4.2X30self-tapping screws provided in the accessory package to fix it. (Fig.10) 7.Install plate fixed. Insert the install plates into the main body jockey for position(one of each side), use the ST4.2X10 self-tapping screws provided in the accessory package to fix them. (Fig.11) 8 Fig.10 Fig.11