Panasonic FV20VQ3 Installation Instructions - Page 7
Installation, Existing, Construction, Maintenance
View all Panasonic FV20VQ3 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 7 highlights
INSTALLATION III (IN EXISTING CONSTRUCTION) Installing the fan body in an existing building requires an accessible area (attic or crawl space) above the planning installation location, or existing ducting and wiring. 1. To install the fan body, follow the procedures described in Installation II. Take the following precautions before installation. CAUTION Check area above planning installation location to be sure that: 1. Duct work can be done and that area is sufficient for proper ventilation. 2. Wiring can be run to planning location. 3. No wiring or other obstructions will interfere with installation. 2. Inspect duct work and wiring before proceeding with installation. 3. Plan suitable location for fan body (next to ceiling joist). 4. Before installation, ensure there is sufficient space available (no obstruction or interference). MAINTENANCE WARNING Disconnect power source before working on unit. Routine maintenace of the fan must be done every year. CAUTION 1. Never use petrol, benzene, thinner or any other such chemicals for cleaning the ventilating fan. 2. Do not damp water to enter motor. 3. Do not soak resin parts in water over 60°C (140°F). 1. Remove grille. (Squeeze mounting spring and pull 2. Wash and clean grille. (Use non-abrasive kitchen down.) (Fig. 8) detergent.) Wipe dry with new cloth. (Fig. 9) Slot Gloves Grille Mounting spring Fig. 8 7 Fig. 9