Panasonic KY-B84AX Installation Instructions - Page 6
Post-installation Checklist
View all Panasonic KY-B84AX manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 6 highlights
Post-installation Checklist Upon completing installation, check and mark off the following items. Checklist Appearance -- Does the appliance not look like it is tilted to the front, back, left or right? -- Is the frame not lifted up? -- Is the top plate clean? Electrical work -- Is the power supply a single phase, 240 V? -- Has the ground been installed? -- Has the earth leakage circuit breaker been installed? Electrical testing 1. Touch to turn on the main power. -- Does the main power light light up? 2. Touch the following keys to check function of each IH heater: -- Left front heater Does "7" (heat level display) -- Left rear heater flash? -- Right front heater -- Right rear heater Checked -- Make sure to turn off each IH heater and the main power switch after performing electrical testing. -- Hand the Operating Instructions, Installation Instructions, and Warranty Certificate to the customer. I hereby certify that installation has been completed. Panasonic Canada Inc. 5770 Ambler Drive, Mississauga, Ontario, L4W 2T3 www.panasonic.ca © Panasonic Corporation 2011 10 Signature of installer Printed in Japan