Panasonic UB-T781W Assembly Instructions - Page 41
Wall Mounting Construction, Checking the Wall
View all Panasonic UB-T781W manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 41 highlights
Installation Manual Wall Mounting Construction Checking the Wall When mounting on a wall, consult with your building's owner, caretaker or construction manager to determine if the wall strength is sufficient to install the elite Panaboard. For safety, install the elite Panaboard only after thoroughly understanding the type of walls, the appropriate types of screws and the construction method (Page 45). CAUTION Do not attach the electronic board to mortared walls. Accidental electric leakage from the wall mounting plate bolts to metal laths or wire laths can cause heat, smoke or fire. 1 I. Necessary Tools and Parts (not included with the elite Panaboard) Drill, Screwdriver, Measuring tape, Level 8 screws (M6 size) II. Before Starting 1. Make sure that the wall is strong enough to support the elite Panaboard. Rated strength: greater than 1,373 N (140 kgf) Notice • If necessary, reinforce the wall so that it is strong enough to support the elite Panaboard. 2. Make sure that the location is large enough to accommodate the elite Panaboard. Height: greater than 2,100 mm (6 ft. 10 5/8 in.) Width: greater than 2,000 mm (6 ft. 6 3/4 in.) 3. Make sure that the AC outlet is within 3 m (9 ft. 10 1/8 in.) of where the elite Panaboard will be mounted and that it will not be behind the elite Panaboard. Operating Instructions (For Basic Operations) 41