Pfaff synchromatic 1215 Owner's Manual - Page 10

Inserting, Upper, threading

Page 10 highlights

Inserting the bobbin case Lift latch A and push the bobbin case onto stud B as far as it will go, making sure slot C points upwards. Release latch A. Latch A and stud B must be flush. Upper threading Pull the thread from the spool and draw it into slot A, guide B and take-up lever 1. Then pull it into guide C and thread guide D on the needle holder.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34

Inserting
the
bobbin
case
Lift
latch
A
and
push
the
bobbin
case
onto
stud
B
as
far
as
it
will
go,
making
sure
slot
C
points
upwards.
Release
latch
A.
Latch
A
and
stud
B
must
be flush.
Upper
threading
Pull
the
thread
from
the
spool
and
draw
it
into
slot
A,
guide
B
and
take-up
lever
1.
Then
pull
it
into
guide
C
and
thread
guide
D
on
the
needle
holder.