Pioneer PRV-LX1 PRV-LX1 RS-422A Command Protocol Manual - Page 17

Product-Specific Notes, 8.1 Recording Delay - specifications

Page 17 highlights

PRV-LX1 RS-422A Protocol 8.0 Product-Specific Notes 8.1 Recording Delay There is a short delay of approximately 29+/-2 frames between when the PRV-LX1 is issued a record command and the command is executed. This delay is a result of the following: Requires 12 frames for encoding system setup Execution of the command may take +2 frames Execution of the command may take-2 frames Record default offset for the LX1 is 17 frames The above delay shows the calculation of a maximum +29 frames +/- 2 frames delay. Pioneer Electronics suggest that PRV-LX1 users pad these frame times to the head/tail of the selected I/O points to ensure that an entire video sequence is recorded. Page 16 of 18

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20

PRV-LX1 RS-422A Protocol
8.0
Product-Specific Notes
8.1 Recording Delay
There is a short delay of approximately 29+/-2 frames between when the PRV-LX1 is issued a record
command and the command is executed.
This delay is a result of the following:
±
Requires 12 frames for encoding system setup
±
Execution of the command may take +2 frames
±
Execution of the command may take–2 frames
±
Record default offset for the LX1 is 17 frames
The above delay shows the calculation of a maximum +29 frames +/- 2 frames delay.
Pioneer Electronics suggest that PRV-LX1 users pad these frame times to the head/tail of the selected
I/O points to ensure that an entire video sequence is recorded.
Page 16 of 18