Poulan PP1130ESC User Manual - Page 6
Install Discharge Chute / Chute Rotater Head, See Fig. 7, Install Auger Control Rod See Figs. 5
View all Poulan PP1130ESC manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 6 highlights
ASSEMBLY / PRE-OPERATION TRACTION DRIVE CONTROL LEVER RETAINER SPRING AUGER CONTROL ROD RETAINER SPRING AUGER CONTROL LEVER TRACTION DRIVE CONTROL ROD DRIVE CONTROL BRACKET FIG. 4 INSTALL AUGER CONTROL ROD (See Figs. 5 and 6) The auger control rod has the short loop on the end of the spring as shown. 1. Slide rubber sleeve up rod and hook end of spring into control arm with loop opening up as shown. 2. With top end of rod positioned under right side of control panel, push down on rod and insert end of rod into hole in auger control bracket. Secure with retainer spring. CONTROL ARM AUGER CONTROL ROD RUBBER SLEEVE AUGER CONTROL BRACKET FIG. 6 INSTALL DISCHARGE CHUTE / CHUTE ROTATER HEAD (See Fig. 7) NOTE: The multi-wrench provided in your parts bag may be used to install the chute rotater head. 1. Place discharge chute assembly on top of chute base with discharge opening toward front of snow thrower. 2. Position chute rotater head over chute bracket. If necessary, rotate chute assembly to align square and pin on underside of chute rotater head with holes in chute bracket. 3. With chute rotater head and chute bracket aligned, position chute rotater head on pin and threaded stud of mounting bracket. 4. Install 3/8 washer and locknut on threaded stud and tighten securely. CHUTE ROTATER HEAD 3/8 LOCKNUT 3/8 WASHER LOOP OPENING UP FIG. 5 CHUTE BRACKET FIG. 7 PIN THREADED STUD ROTATER HEAD MOUNTING BRACKET 6